23 Live Notices for Luxembourg Food and Beverages Tenders
Showing 1 to 20
Fountain Work (Ve 5520) - House Of The Ains Rumelange
Fontainerie Work To Be Carried Out On Behalf Of Servior As Part Of The Project To Build The New Household House At L-3743 Rumelange. The Works Consist As Follows: - Concrete Pool - Red And Black Granite Coverings - Gutters - Fontainerie Equipment (Pipes, Connections, Filtration, Fog Animation, Etc.) - Electrical Equipment
Dry Construction Work (Ve 3540) For The New Household House In Rumelange
Declacer - General Embankments: 32,000 M2 Of Top Ground Stripping With On -Site Storage; 18,000 M3 Of Large Mass Earthworks In A Class 2 To 6 Field; 39,000 M3 Of Large Mass Earthworks In A Class 7 Plot; 30,000 M3 Of Crushed Embankment Of The Site. The Duration Of The Work Is 100 Working Days, To Be Started In The Fall Of 2025. The Work Is Sold At Unit Prices.
Dry Construction Work To Be Carried Out On Behalf Of Servior As Part Of The Project To Build The New Household House At L-3743 Rumelange. Large Work: - Dry Partitions: Approx. 10,000 M² - False -Plafonds: Approx. 7,200 M² - Mobile Partitions: 4 Pcs - Sanitary Partitions: Approx. 170 M²
Collection And Exploitation Of Various Waste From Agriculture, Fruit And Viticulture In The Grand Duchy Of Luxembourg For The Years 2025 To 2029
The Client Intends The Services For The Collection, Transport And Recycling Resp. Disposal Of The Following Waste From Agriculture, Fruit And Viticulture In The Grand Duchy Of Luxembourg: Siloplasty, Stretch Film, Undercoat, Bale Network, Bale Cords, Plastic Cords From Viticulture, "Big Bags" (Lot 1) And Piles From The Wine And Fruit Growing (Lot 2). Comparable Materials From Other Professional Sectors Can Be Excluded From This Collection. The Relevant Contract To Be Concluded Includes The Following Services In Particular: • Establishment And Operation Of A National Coordination Center • Establishment And Operation Of Regional Intermediate Bearings To Accept Waste • Transport Of Waste To The Recycling Resp. Disposal Systems • Users Or Disposal.
Interior Joinery Work With 39 Interior Doors (Wood And Metal In A Historic Setting), Lockers For Changing Rooms, Wc Separation Partitions. The Duration Of The Work Is 45 Working Days, To Start The 3Rd Half Of 2025. The Work Is Sold At Unit Prices.
The Project Consists Of The Migration Of The It Room Of The Thermal Domain: Creation Of The New It Room With Implementation Of New Racks, A New Extinction Center; Implementation Of Ups And Air Conditioning Cabinet; Creation Of A False Technical Ceiling And Partitioning Of The Premises; Deviation Of Network Cables And Implementation Of New Connections (Fo And Copper) The Duration Of The Work Is 35 Working Days, To Start During Week 44 In 2025. The Work Is Sold At Unit Prices.
Support Of Aptean Plm Lascom Edition
Gros-Oeuvre: Reinforced Concrete, Wooden Construction And Metal Structure; Infrastructure Works: Buried Networks, Pipelines And Retention Basins, Outdoor Layout: Embankment, Steam Installation, Roads With A Bus Stop; Networks: Evacuation Pipe Under Building, Integration Of Sheaths Into Concrete; Site Installation: Containers, Electrical Distribution, Site Fence. The Start Of The Work Is Scheduled For 18.08.2025. The Overall Duration Of The Work Is 570 Working Days
The Order Includes The Entire Services Of Thermal Insulation And Fire Protection Measures Of The Building Technology Systems Across Industries From Heating, Cold, Ventilation, Sanitary, Electrical, Med. Gas And Sprinkler. This Consists Of Heat Or Cold Insulation Of The Cables Of The Trades Listed Above, As Well As The Fire Protection Isolation And Execution Of Fire Payments In Connection With The Affected Trades And All Other Secondary Services. The Services Or Quantities Listed Below Must Be Carried Out As Part Of The Work For The "Ve4060 Thermal Insulation Fire Protection" For The New Center Building And Its Outbuildings (Nouveau Bâtiment Center) Of The Chl: Thermal Insulation & Fire Protection Installations:- Heat Insulation Of Heating And Steam Pipes From Dn250 Approx. 53,000M; - Thermal Insulation Of Cold Pipe Lines From Dn10 To Dn300 Approx. 56,000M; - Thermal Insulation Of Sanitary Pipelines From Dn12 To Dn300 Approx. 81,500M - Thermal Insulation Of Ventilation Channels Approx. 48.230M2 - Heat Insulation From Ventilation Pipes Dn80 To Dn400 - Fire Protection Insulation Of Approx. 9.200M - Fire Protection Cladding Approx. 1,800M2 - Fire Protection Caps From Hard And Hard And Hard Soft Gaps Approx. 14.110 St.
Assignment The La Commune The Rice Den
Gros-Oeuvre: Reinforced Concrete, Wooden Construction And Metal Structure; Infrastructure Works: Buried Networks, Pipelines And Retention Basins, Outdoor Layout: Embankment, Steam Installation, Roads With A Bus Stop; Networks: Evacuation Pipe Under Building, Integration Of Sheaths Into Concrete; Site Installation: Containers, Electrical Distribution, Site Fence. The Start Of The Work Is Scheduled For 18.08.2025. The Overall Duration Of The Work Is 570 Working Days
The Order Includes The Entire Services Of Thermal Insulation And Fire Protection Measures Of The Building Technology Systems Across Industries From Heating, Cold, Ventilation, Sanitary, Electrical, Med. Gas And Sprinkler. This Consists Of Heat Or Cold Insulation Of The Cables Of The Trades Listed Above, As Well As The Fire Protection Isolation And Execution Of Fire Payments In Connection With The Affected Trades And All Other Secondary Services. The Services Or Quantities Listed Below Must Be Carried Out As Part Of The Work For The "Ve4060 Thermal Insulation Fire Protection" For The New Center Building And Its Outbuildings (Nouveau Bâtiment Center) Of The Chl: Thermal Insulation & Fire Protection Installations:- Heat Insulation Of Heating And Steam Pipes From Dn250 Approx. 53,000M; - Thermal Insulation Of Cold Pipe Lines From Dn10 To Dn300 Approx. 56,000M; - Thermal Insulation Of Sanitary Pipelines From Dn12 To Dn300 Approx. 81,500M - Thermal Insulation Of Ventilation Channels Approx. 48.230M2 - Heat Insulation From Ventilation Pipes Dn80 To Dn400 - Fire Protection Insulation Of Approx. 9.200M - Fire Protection Cladding Approx. 1,800M2 - Fire Protection Caps From Hard And Hard And Hard Soft Gaps Approx. 14.110 St.
The Work Concerns 55 (8.75M2) And 34 (3.75M2) Metallic Windows Which Will Be Installed In The Historical Heritage As Well As The Preparatory Work (Leveling And Sanitation Of Sandstone Embrasures) For The Installation Of The Windows. The Duration Of The Work Is 165 Working Days, To Be Started In September 2025. The Work Is Sold At Unit Prices.
The Market Is To Assist The Ctie To Support The Teams Of The State Information Technology Center In The Evolution Of Waf (Web-Application Firewall) Platforms Currently In Place And Related Projects.
The Market Consists Of The Provision Of An All -Risk Site Insurance Contract (Trc). The Contract Will Cover Sections 1 "Thing Insurance - Damage And Losses", 2 "Responsibility Insurance" And 3 "Damage To Existing Goods". The Duration Of The Services Is 57 Months To Start The 1St Half Of 2025. The Services Are Sold At Unit Prices.
Kitchen Facilities Work On Behalf Of Servior As Part Of The Project To Build The New Household House At -3743 Rumelange. Large Work: Installations Of A Production Kitchen For Approx. 250 Meals/Day, Refrigeration Installations, Hoods, Hot And Cold Kitchen Furniture, Bar/Restaurant Installations, Distribution Kitchens, Equipment.
Kitchen Installation Work (Ve 4710) - New Household House In Rumelange