29 Live Notices for Building Materials bids and RFP from Luxembourg
Showing 1 to 20
Ibm Maximo® Support Services
Accs Deployable Shelters Sustainment Services
2487 – Wood Joinery Work And Interior Metal Joinery Work - “Wëltgebond” Lot 48 - Construction Of 42 Housing Units In Mamer
2487 – Wood Joinery Work And Interior Metal Joinery Work - “Wëltgebond” Lot 48 - Construction Of 42 Housing Units In Mamer
Provision Of Hose, Nonmetal
2518 - Energy Transformation And Renovation Of An Aal Post Building In Wecker - Structural Work, Demolitions And Preparations, Masonry And Reinforced Concrete And Exterior Developments
The Contract Includes All The Systems In The Cost Groups Of Wastewater And Water Systems, Consisting Of Wastewater And Rainwater Pipes, Lifting Systems, Water Treatment Systems, Pressure Boosting Systems, Pipelines, Water Heaters And Sanitary Objects As Well As Installation Blocks. The Sanitary Equipment Of The Prefabricated Wet Rooms In The Bedrooms Is Not Part Of This Tender. The Contract Includes The Following Work: The Services And Quantities Listed Below Are To Be Carried Out As Part Of The Work For The Contract Unit "Ve4010 Sanitary Installations" For The New Center Building And Its Outbuildings (Nouveau Bâtiment Centre) Of The Chl: Wastewater And Water Systems / Sanitary Facilities: - Wastewater Systems - Approx. 16,500M Of Cast Iron Wastewater Pipes And Ventilation Pipes For Wastewater And Medicinal Wastewater - Approx. 400M Of Wastewater Pipes And Ventilation Pipes - Double Pipe System With Insulation And Lead Foil For Radioactively Contaminated Wastewater - Approx. 250M Of Cast Iron Wastewater Pipes For Fire Water Retention With Fittings And Accessories - Pp Safety Basin For Wastewater From The Decontamination System In The Rescue Hall - Approx. 500M Of Cast Iron Wastewater Pipes For Fire Water Retention Helicopter Landing Pad With 2 Fire Water Retention Basins, Fittings And Accessories - Approx. 400M Of Cast Iron Wastewater Pipes For The Kitchen Area, And Grease Separator Ns 20 With Lifting System - Approx. 350M Of Waste Water Pipes Made Of Pe-Hd For The Dialysis Area - 7 Waste Water - Faeces-Free And Faeces-Loaded Lifting Systems With Approx. 400M Of Pressure Pipes Made Of Stainless Steel, Fittings And Accessories - Approx. 6700M Of Rain Water Pipes Made Of Cast Iron - Gravity Drainage - 10 Rain Water - Lifting Systems With Approx. 230M Of Pressure Pipes Made Of Stainless Steel, Fittings And Accessories - Water Systems - House Connection With Uv Disinfection Systems,
CHL NBC VE 3410 Drywall and lightweight construction work
Renewal of pipes and conduits in the streets of Scheid, Schetzel, Cité Wakelter and d'Ernster in Oberanven
Supply of ductile iron, HDPE and stainless steel pipes
- Asbestos Removal (1 Confined Area, Applications: Embedded Asbestos-Cement Elements) - Site Cleaning (Clearing, Collection Of Various Non-Contaminated Waste, Asbestos-Cement Elements, Etc.) - Cleaning Of Existing Buildings (Dismantling Of Various Installations) - Deconstruction Of Existing Buildings Into Asbestos-Cement, Reinforced Concrete, Wood And Steel Elements: O Piggery Building Called "Stall": Approx. 11,700 M³ On Approx. 1,225 M² Base, Including Tank Below The Building O Annex Building Called "Schuppen": Approx. 1,400 M³ On Approx. 280 M² Base - Removal Of Asphalt Coating, Removal Of Fuel Tank - Backfilling Of Excavation - Waste Management Expected Duration: - Asbestos Removal In Confined Area: Approx. 10 Days - Deconstruction Including Asphalt Removal And Backfilling: Approx. 3 Months Execution Period: - April – June/July 2025
Scope Of Work: - Earthworks: 4,000 M3 - Backfill In Crushed Stone, Sand, Shot: 1,900 M3 - Concrete / Reinforced Concrete Works: 525 M3 - Reinforced Concrete Pipes Dn1000: 30 Ml Expected Start Of Work: March 2025 Duration Of Work: 200 Working Days
Scope of work: Mechanical earthworks in trenches: ± 5,000 m3 Concrete pipeline DN300 – 400: ± 830 m Water pipe DN 100 – 150: ± 900 m Borders – rows of paving stones: ± 5,500 ml Bituminous coatings: ± 1,300 to
The work is to be carried out in the interest of the playground of the Muhlenbach schoolyard in Luxembourg City. The work must be carried out during the summer school holidays requiring an exemption for work during collective holidays. The requested work concerns: - Work to supply and install steel and wooden playground equipment - Concrete work for the foundations of the playgrounds - Flexible flooring work for the fall zone - Work to create artificial rocks as a climbing wall
Construction of an administrative building by general contractor Scope of work: Construction of a wooden building with a ground floor and an upper floor with wall and ceiling elements prefabricated in the workshop and assembled on site Earthworks and drainage: 2,400 m3 Concrete for foundation: 200 m3 Prefabricated elements for walls: 1,500 m2 Prefabricated elements for glued laminated slab: 1,200 m2 Finishing work
The contract includes the production of metal doors and locksmith equipment for the administrative building.
The contract includes the production of wooden doors, custom-made furniture, coverings and finishing of the administrative building.
Chl Nbc Ve 3410 Drywall And Lightweight Construction Work
Procurement Of Clamp, Loop Used On Lynx Mk95A
EXTERIOR WOOD AND ALUMINIUM JOINERY WORK - CONTERSTUFF