64 Live Notices for Energy, Power and Electrical bids and RFP from Luxembourg
Showing 1 to 20
Chl Nbc Ve4100 Building Automation
Studios Hedeknippchen
The Order Includes The Entire Building Automation System Consisting Of Field Devices, Automation Stations, Room Automation, Fire Damper Detection And Control System, Passive Network Components, Building Management Technology, Control Cabinets, Cabling And All Other Ancillary Services Of The Building Automation Systems. The Services And Quantities Listed Below Are To Be Carried Out As Part Of The Work For The Contract Unit "Ve4100 Building Automation" For The New Center Building And Its Annexes (Nouveau Bâtiment Centre) Of The Chl: Building Automation Installations: - Approx. 6,000 Field Devices - 88 Bacnet/Sc Automation Stations - 290 Room Automation Controllers - Approx. 1,600 I/O Modules Of The Room Automation - 55 Control Cabinets - Approx. 400 Km Of Cables And Lines - 1 Fire Damper Detection And Control System With Approx. 1,700 Motor Modules - Bms Software In Redundant Version - Energy Monitoring Software
Photovoltaic Installation Work To Be Carried Out In The Interest Of The Guillaume Kroll High School In Esch-Sur-Alzette
Construction Work On A Metal Structure For Photovoltaics To Be Carried Out In The Interest Of The Guillaume Kroll High School In Esch-Sur-Alzette
Provision Of Spare Parts Used On Ab-212
2571 - Electrical Works - Construction Of 2 Residences With 6 Units, 1 And 3 Op De Quäärten In L-3961 Ehlange-Sur-Mess
Circuit Card Assembly For Hawk Weapon System
Mobile Field Kitchens / Cooking Modules
Provision Of Switch,Pressure Used On C-295 Cn.235-10
Automatic Locker Installation Work
The Project Consists Of The Construction Of A New Building As Well As The Transformation And Renovation Of Existing Buildings. - Installation Of 42 Ventilation Units, 2 Heat Pumps, +/- 700 Radiators/Convectors, +/- 5,400 M2 Of Underfloor Heating And +/- 4,900 M2 Of Cold Ceiling - Sanitary Installation, Production, Distribution And Sanitary Equipment. - Low Voltage And Low Current Electrical Installation, +/- 26 Tgbt Cells, +/- 150 Secondary Panels, Lighting, Equipment, Video And Sound System. The Duration Of The Works Is 1368 Working Days, Starting In The 2Nd Half Of 2025. The Works Are Awarded At Unit Prices.
List 2024_42_Po_ Electrical Room & Switchgear Cabinet
Fhl Purchasing Center: Supply Of Electricity From Renewable Sources And Supply Of Natural Gas (Energi24).
Provision Of Electronic Components Assembly
Supply For Ab-212
Supply For Ab-212
Supply Of On-Line Ups For Rsrp Radar
Technical Assistance For The Bangladesh Renewable Energy Facility
Technical Assistance, Upgrade, Repair And Maintenance Of Components In The .