74 Live Notices for Machinery and Equipment bids and RFP from Luxembourg
Showing 1 to 20
Supply Of Security Containers For Sofcom
Various Components And Spares For Aw169 Helicopter
Crankshaft, Engine For Armored Vehicles
Inspection, Repair Of Ring Laser Gyro Used On Cn235 / 461300
Supply Of Trucks And Machinery 2024_2
2571 - Elevator Works - Construction Of 2 Residences With 6 Units, 1 And 3 Op De Quäärten In L-3961 Ehlange-Sur-Mess
2571 - Elevator Works - Construction Of 2 Residences With 6 Units, 1 And 3 Op De Quäärten In L-3961 Ehlange-Sur-Mess
2571 - Hvac And Sanitation Works - Construction Of 2 Residences With 6 Units, 1 And 3 Op De Quäärten In L-3961 Ehlange-Sur-Mess
Supply Of Pol, Filters & Consumables Kits For Natinamds
Provision Of Bolt,Shoulder Used Cn.235-10 & Cn295 On
Provision Of Brush Set,Electrical Contact
Hvac-Sanitary Installation Work (Air/Water Heat Pump In Cascade; Electric Dhw Boilers; Underfloor Heating/Radiators; 4000 M3/H Cta; Sanitary Installation And Equipment) As Part Of The Construction Of A Nursery (Renovation With Extension) In Diekirch.
Provision, Installation And Maintenance Of A Living Base Including Sanitary Modules - Changing Rooms - Refectories - Infirmary And Staircase. Provision, Installation And Maintenance Of A Sorting Center Including All The Equipment Necessary For Sorting Most Of The Waste From The Site. Maintenance And Supervision Of The Site. The Duration Of The Works Is 1,328 Working Days, Starting In The 2Nd Half Of 2025.
The Project Consists Of The Construction Of A New Building As Well As The Transformation And Renovation Of Existing Buildings. - Installation Of 42 Ventilation Units, 2 Heat Pumps, +/- 700 Radiators/Convectors, +/- 5,400 M2 Of Underfloor Heating And +/- 4,900 M2 Of Cold Ceiling - Sanitary Installation, Production, Distribution And Sanitary Equipment. - Low Voltage And Low Current Electrical Installation, +/- 26 Tgbt Cells, +/- 150 Secondary Panels, Lighting, Equipment, Video And Sound System. The Duration Of The Works Is 1368 Working Days, Starting In The 2Nd Half Of 2025. The Works Are Awarded At Unit Prices.
Rfp 230051 - Framework Agreement For The Supply, Installation, Repair And Maintenance Of Multimedia Equipment
Provision Of Electronic Components Assembly
15 Mssr 2000Id 2000W Interrogator Sets
Various Components And Spares For As 532Al Heli
Nasams Air Defense System Spare Parts (10 Items)
The Contract Includes The Entire Steam Supply Systems, I.E. Primary Steam And Pure Steam Installations Consisting Of Primary Steam And Pure Steam Generators With Exhaust Systems In The Central Units With Appropriate Water Treatment, As Well As The Complete Steam/Pure Steam Distribution With Fittings Such As Shut-Offs, Condensate Drains, Etc., As Well As All Other Ancillary Services Of The Steam Supply Installations. The Services And Quantities Listed Below Are To Be Carried Out As Part Of The Work For The Contract Unit "Ve4090 Steam Supply Installations" For The New Center Building And Its Outbuildings (Nouveau Bâtiment Centre) Of The Chl: Steam Supply Installations: - Main Center "Heating Center" With 2 Steam Boilers Approx. 2,000 Kg/H (9 Bar), With Associated Feed Water Degassing Approx. 3,000 Liters, Suitable Expansion And Heat Recovery Unit, As Well As Fittings And Accessories - 3 Sub-Centers With Pure Steam Generators Of 2 X Approx. 1,170 Kg/H (Steam Humidification Air Handling Units) And 1 X 540 Kg/H (Central Sterilization), With Fittings And Accessories - Approx. 760 M Steam Piping System Dn15 To Dn250 Complete With Molded Parts Such As Bends, T-Pieces, Compensators, Loose And Fixed Points, Etc. Welded Joints And Accessories - Approx. 735 M Of Condensate Stainless Steel Piping System Dn15 To Dn125 Complete With Fittings Such As Bends, T-Pieces, Compensators, Loose And Fixed Points, Etc. Welded Joints And Accessories - Approx. 1,800 M Of Pure Steam And Condensate Piping System Dn15 To Dn100 Complete With Fittings Such As Bends, T-Pieces, Compensators, Loose And Fixed Points, Etc. Welded Joints And Accessories