30 Live Notices for Metals and Non-Metals bids and RFP from Luxembourg
Showing 1 to 20
Electromechanical Equipment Of A Storm Basin Including All Related Installations: - 1 Logger - 1 Flow Regulation Systems Including Manual Valves - Electrical Cabinet With All Electrotechnic Installations Including The Sensors And Level Probes - 1 Compressor And 1 Dryer Per Adsorption - 2 Pumping Systems - 3 Agitators - 1 Surveillance And Control Installation - 1 Platform To Caillebotis And Metal Work
Valve,Regulating,Fluid Pressure For F-16
Installation Of Metal Structures
Inspection, Oh Of 7 Ea Valve Pneumatic Tanl Used On As-532
Supply Of Electron Tubes
Design Of Thermal Bypass Valves For Sindre Ii Radar
Supply Of Bearing, Ball, Annular, For Rat-31 Radar (Germany)
2408 - Construction Of 10 Single -Family House And 1 House With Integrated Accommodation, Im Schiesberg In Useldange - Locksmith Work Work
Error 500 (Server Error)!!1500.That’S An Error.There Was An Error. Please Try Again Later.That’S All We Know.
• Disassembly Existing Installation • New 165 Kw Boiler • Air Heat Pump -Eau 35 Kw • Departure And Return Collector • Connection Piping • Insulation • Regulatory Table • Electric Connection • Drinking Water Distribution • Water Treatment • Distribution Tube • Insulation
• Site Installations • Piping And Empty Tubes: Approximately 600 Ml • Various Wiring -20,000 Ml • Various Devices: Approximately 650 Pcs • 1 Lighting Management Station • Rescue And Safety Lighting • Interior Lighting, Exterior • Fire Detection • Computer Network And Telephone • Debuting • Videoparlophonie, Intrusion
2408 - Construction Of 10 Single -Family House And 1 House With Integrated Accommodation, Im Schiesberg In Useldange - Locksmith Work Work
The Order Includes The Central Water / Permeat Preparation, As Well As The Associated Concentration Supply For The Dialysis Treatment Of Patients Of The Chl Nbc. The Water / Permeate Preparation Is Carried Out Redundantly 2 X 100% And Each Includes The Coarse Filter, Softening System, Activated Carbon Filter, Fine Filter With Double Reversal Osmosis System And Switchover Unit. The Processing Is Scheduled For The Processing With Hot Cleaning Up To The Dialysis Places Or Technician Places Included. For Dialysis Treatment, The Concentration Supply For 3 Concentrates From The Headquarters To The Dialysis Places Is Also Planned. These Installations Also Include All The Necessary Fittings, Shut-Off And Check Valves, System Separator, Measured Value Provider, Etc., As Well As The Associated Measuring Systems With Switching And Control Cabinets Including Cabling, As Well As All Other Side Services Of The Aforementioned Installations. The Order Includes The Following Work: The Services Or Quantities Listed Below Must Be Carried Out As Part Of The Work For The "Ve4011 Sanitary-Dialysis Care" For The New Center Building (Nouveau Bâtiment Center) Of The Chl: Sanitary-Dialys Care - Installations:- Center With 2 X 100% Dialysis Water Preparation, Consisting Of Coarse Filter, Fine Filter, Softening Systems, Activated Carbon Filters, Double Reversal Osmosis System With An Output Of Approx. 2,000L/H. -Desinfection Devices.
The Order Includes The Entire Headquarters Of The "Sanitary Nuclear Wastewater Treatment", I.E. Collecting And Conjunction With 3 Different Nuclides Of Dirt Or Sewage, Associated Accumulation Vessels With Level Measurements, Overflow Protection, Shredding And Gyroscopic Pumps, Trial Drawing Directions, Leakage Probes, Pores With Shut-Off And Check Valves, Associated Measuring Systems With Switching And Control Cabinets Including Wiring, As Well As All Other Additional Services Of The Aforementioned Installations. "Execution For The New Center Building (Nouveau Bâtiment Center): Sanitary - Nuclear Wastewater Treatment - Installations: - Main Center" Downroom - Wastewater Treatment "With 3 St. Collecting And Abandoning Systems With Each. Disconnection Systems With Each. 2M3 Absorption Volume And 2 Hours Of Collecting And Cooldown Systems With Each. 1M3 Absorption Volume With Accessories- Measuring Systems And Control Cabinets With Cabling For The In Front Of The 3-Nuclid Chips With Accessories- Approx. 300M Piping System With Fittings, Such As Shut-Off Valves, Lock Valves And Accessories
• 32.7 Kw Water-Water Heat Pump • Various Connection Equipment • Fan Coils And Radiators • 1X 2400M³/H Ventilation Unit • 1X 3000 M³/H Ventilation Unit • Ventilation Duct And Accessories Approximately 200M² • 1000 Ml Connection Pipe • Control Panel • Drinking Water Distribution • Sanitary Appliances • Distribution Tube
• Site Installations • Pipes And Empty Tubes: Approximately 600 Ml • Various Wiring -20,000 Ml • Various Equipment: Approximately 650 Pcs • 1 Lighting Management Station • Emergency And Safety Lighting • Interior And Exterior Lighting • Fire Detection • Computer And Telephone Network • Smoke Extraction • Video Intercom, Intrusion
Supply Of Swaging Tool Kit
Nsn 3110-00-858-2670, Bearing,Ball,Annular
Supply Of Retainer, Nut And Bolt For As-532 Ul
Closed Structural Work To Be Carried Out In The Interest Of The Domaine Thermal Mondorf-Renovation And Compliance