7 Live Notices for Roads and Highways bids and RFP from Luxembourg
Showing 1 to 7
Expected Start Of Work: 01.04.2025. Duration Of Work: 400 Working Days.
The Start Of The Works Is Scheduled For Mid-March 2025. The Duration Of The Works Is 250 Working Days. Scope Of Works: - Earthworks: 1900 M2 - Embankment Works: 3800 M3 - Asphalt Works: 100 M2 - Paving Works: 900 M2 - Works For Various Networks: 500 M - Water Pipe Works: 340 M - Wastewater Pipe Works: 315Pp 120M 500Pp 200M
Infrastructure Works In Beggen Street
Straightening Of Cr139 From Lellig To Herborn With Reconstruction Of Oa371 And 372
Redevelopment Of The Wangert Climb And The Haut-Wangert Climb In Differdange.
Scraping, reprofiling and surface coating campaign on the State roads of the Diekirch Roads Division for the years 2025 and 2026
Scraping, Reprofiling And Surface Coating Campaign On The State Roads Of The Diekirch Roads Division For The Years 2025 And 2026