37 Live Notices for Metals and Non-Metals bids and RFP from Malaysia
Showing 1 to 20
Maintenance Works for Water Tanks. Pump Houses and Other Areas Specified in Zone 3 for Syarikat Air Terengganu Sdn Bhd. (SATU) Hulu Terengganu District for a Period of One (1) Year
Maintenance Works for Areas in Water Tanks. Pump Houses and Other Areas Specified in Zone 2 for Syarikal Air Terengganu Sdn Bhd. (SATU) Hulu Terengganu District for a Period of One (1) Year
Maintenance Works for Areas in Water Tanks. Pump Houses and Other Areas Specified in Zone 1 for Terengganu Water Company Sdn. Bhd. (SATU) Hulu Terengganu District for a Period of One (1) Year
Gbk114 Taman Indah Perdana (Bfps) Sump Cleaning At Bio Filter Tank And Replacement Of Guide Rail For Bio-Filter Pump 1-4
WORKS TO INSTALL 'HANDRAILING', 'TOE GUARD' IN RAW WATER INLET CHAMBER & PATH TO CLARIFIER TANK, LIME TANK, FILTER TANK AS WELL AS WORKS TO INSTALL 'GRATING' IN FILTER GALLERY PATH AT SEMBRONG BARAT WATER PLANT, KLUANG, JOHOR.
SUPPLY, DELIVER, INSTALL AND COMMISSIONING WORKS FOR CHLORINE DOSING SYSTEM AT WTP SULTAN ISMAIL FOR RANHILL SAJ SDN. BHD.
SUPPLY, DELIVER, INSTALL, TESTING AND COMMISSIONING TWO (2) UNITS AUTOMATIC FLOOR MOUNTED CHLORINATOR 150KG/H FOR CHLORINE DOSING SYSTEM AT WTP SULTAN ISKANDAR FOR RANHILL SAJ SDN. BHD.
BUILDING AND OFFICE SPACE CLEANING SERVICES INCLUDING MAINTAINING SANITARY BIN AT MELAKA REVENUE TOWER, ALOR GAJAH SATELLITE OFFICE, JASIN SATELLITE OFFICE AND CITY TRANSFORMATION CENTER (UTC) FOR THE INLAND REVENUE BOARD OF MALAYSIA
Supplying, Delivering Liquid Helium at the Natural Products Division for the Malaysian Forestry Research Institute, 52109 Kepong Selangor.
Cadangan Kerja-Kerja Perkhidmatan Pembekalan Dan Penghantaran Tong Sampah Besi Leach Bin "Lb 1100 L" Bagi Tujuaan Kerja-Kerja Kutipan Sampah Domestik Di Kampung Tradisi Daerah Kuala Langat
SVS-TMS-0125-U6OH TO CARRY OUT OVERHAUL AND SERVICE ON U6 ACW VALVE AND STRAINER DURING OUTAGE
Tank Cover Installation Works, Partial Replacement of Barrier Boards, Repairing Wall Structures and Maintenance of the Office at the Water Treatment Plant of Kampung Tengah 2, Segamat, Johor.
'Klr 306 Pekan Batu To Replace The New Pvc Pipe From Clarifier To Aeration Tank Due To Pvc Pipe Damaged At Underground.
Implementation of the Fire Charity Assistance Project in Sibu Division: Rebuilding Arihim Bin Ahmad Noor's House (Lot 3026, Lorong 12, Kpg Bahagia Jaya Tengah, Teku)
Implementation of the Fire Charity Assistance Project in Sibu Division: New Construction of Yusof Bin Sisin Noor's House (Lot 3026, Lorong 12, Kpg Bahagia Jaya Tengah, Teku)
Implementation of the Fire Relief Project in Sibu Division: Rebuilding Betty Bin August's House (Lot 54, Kpg Nangka)
Implementation of the Fire Charity Assistance Project in Sibu Division: Rebuilding the House of Mohamad Nazarrudin Bin Ahmad Nawas (Lot 56A, Kpg Nangka)
Implementation of the Fire Relief Project in Sibu Division: New Construction of Mahazzaman Bin Ahmad Nawas House (Lot No.65(B), Kpg Nangka)
Supply, Delivery, Testing And Commissioning Of Two (2) Units of 3,000 Litre Water Tank Lorries
Supply and Deliver Tools to Replace Various Small Machines in the Store Center of the Engineering Department Mechanical and Electrical for A Period of Three (3) Years