25 Live Notices for Middle East Gas Turbines Tenders
Showing 1 to 20
538 Pieces Of 1St, 2Nd, 3Rd And 4Th Stage Rotor & Stator Blades And 20 Pieces Of Guide Segments And 60 Pencil Connection Parts For V94.3A(4) Type Gas Turbines In Eüaş Istanbul Natural Gas Power Plants Operation Directorate B Power Plant.
Spare parts for the cleaning pump of the combustion chamber lines and burners for the first phase of the combined cycle gas turbines at the Al-Zour South Station
Spare parts for the chemical injection system for the combined cycle gas turbines, phase 1, at Al-Zour South Station
Purchase of "ALSTOM" GAS TURBINE SPARE PARTS INCLUDING LIMIT SWITCH, FLAME DETECTOR, SEALING"
Call For Re-Tendering At The Same Time As One-Stage Quality Assessment (Integrated) Of Oil Analysis Of Turbines, Compressors, Generators And Transfer Motors Of Gas Pressure Boosting Facilities And Heavy Construction Machinery In Region Two, Advertisement Number: 87330056
Call For Re-Tendering At The Same Time As One-Stage Quality Assessment (Integrated) Of Oil Analysis Of Turbines, Compressors, Generators And Transfer Motors Of Gas Pressure Boosting Facilities And Heavy Construction Machinery In Region Two, Advertisement Number: 87330056
Purchase Request for Spare Parts for the Hydraulic System for the Fuel and Natural Gas Valve Control System for the Combined Cycle Gas Turbines Phase 1 of the Al-Zour South Power Plant
Spare parts for seawater butterfly valves for distillers
Spare parts for control valve 73 and 09 for boilers for Shuwaikh station
Ball valves in gas turbines system – mechanical maintenance monitoring – Shuaiba North Plant
Rfq#2140596_Spares For "Ge" Gas Turbines
Purchase for Gas Turbine Seals for Phase 1 Combined Cycle Gas Turbines at Al-Zour South Power Plant
Purchase Request for General Consumables for Combined Cycle Gas Turbines Phase 1 at Al-Zour South Power Plant
Purchase Request for Internal Operational Spare Parts for Natural Gas Intake Control Valves for Combined Cycle Gas Turbines Phase 1 at Al-Zour South Power Plant
Rfp#2128715_Provision Of Turbine Service Personnel For Siemens Gas Turbines
Supply of Spare Parts for chlorine injection system for gas turbines with combined cycle – phase 1 - at Al Zour Southern Plant
Supply of Spare Parts for control valve on grease oil system for combined cycle for gas turbines with combined cycle – phase 1 - at Al Zour Southern Plant
Supply of Spare Parts for carbon brushes for gas turbines with combined cycle – phase 1 - at Al Zour Southern Plant
Purchase Order of paints for gas turbines with combined cycle – phase 1 - at Al Zour Southern Plant
Purchase Order of spare parts for hydraulic oil pressure regulating tanks in the gas turbines with combined cycle – first phase - at Al Zour Sothern Plant