5357 Live Notices for Mexico Renewable Energy Tenders
Showing 1 to 20
Installation Of Solar Panel In Yuqori Mirzaabad Mfi Building, Baghdad District
Boreholes Solar Materials And Installation Works
Purchase Of Assembled Materials Required For Rooftop Solar Power Plant Installation (29 Items) (There Are Addendum 1 And 2)
Construction Of An Electricity Grid For The Purpose Of Connecting The "Sława 5" And "Sława 6" Photovoltaic Power Plants To The Grid, Plot No. 739/18, In The Town Of Sława, Sława Commune
Development Of Design Documentation And Execution Of Construction And Assembly Works For The Connection Of Renewable Energy Sources In The Scope Of Construction Of Branches With Pole Positions With Disconnectors From Mv Overhead Lines On The Premises Of The Białystok Branch Of Pge Dystrybucja S.A. - 6 Parts
Development Of Design Documentation And Execution Of Construction And Assembly Works For The Connection Of Renewable Energy Sources In The Scope Of Construction Of Branches With Pole Positions With Disconnectors From Mv Overhead Lines On The Premises Of The Białystok Branch Of Pge Dystrybucja S.A. - 7 Parts
Purchase Of Materials For The Construction Of 4 Temporary Classrooms Of 6 M X 7 M, Plus A 2.00 M Corridor + Photovoltaic System, Of The C.E.B.G. Calovébora De Santa Fé
Framework Agreement - Profitable Renewable Energy Systems On Existing Buildings
Installation, Software And Maintenance Of Rack-Mounted Electric Vehicle Charging Stations
Supply - Installation Of A Submarine Pump In The Wind Farm Of Anemodouri
Construction And Commissioning Work On Photovoltaic Power Plants In Morbihan.
Metalwork Facade - Construction Of An Aluminium Sheet, Photovoltaic And Etics Facade
Supply Of Electrical Energy From Renewable Energies For The City Of Bad Doberan For The Delivery Years 2025 And 2026 With The Option Of Extending The Contract Period Twice By One Year Each
Announcement Of The Territorial Delegation Of Economy, Finance, European Funds And Industry, Energy And Mines In Jaén, By Which A Call Is Made For The Drawing Up Of Minutes Prior To The Occupation Of Property And Rights Affected By The Electrical Installation Project "30 Mwp Marmolejo Solar Ii Photovoltaic Solar Park And 30Kv Cs Marmolejo Solar Ii Set Zumajo I Medium Voltage Line", In The Municipality Of Marmolejo (Jaén). File: Pretor 2454.
Resolution Of The General Secretariat Of Energy Granting In Favor Of Green Stone Renewable Viii S.L. The Declaration, Specifically, Of Public Utility For The Electric Power Installation Project "Lat 220 Kv Guadame Solar-Guadame (Ree) With A Section Shared With A 132 Kv Reserve Circuit". File: 20200010.
Resolution Of The Government Delegation In Aragon Calling For The Drawing Up Of Payment Records Of The Properties Affected By The Project For The Terrer Solar Photovoltaic Installation Of 130 Mwp/124.72 Mwins, Terrer 30/132 Kv Substation And 132 Kv High Voltage Overhead Line "Set Terrer Set Terrer Collector", For The Evacuation Of Electrical Energy, In The Municipalities Of Moros, Ateca And Terrer, In The Province Of Zaragoza.
Announcement Of The Industry And Energy Department Of The Government Subdelegation In Burgos, By Which The Request For Modification Of The Prior Administrative Authorization, The Request For Administrative Construction Authorization And The Request For Recognition, Specifically, Of The Public Utility Of The Modified Project 2024 Of The "Desma" Wind Farm With 25 Mw Of Installed Power, Its "Desma Solar" Photovoltaic Hybridization Of 32.075 Mw Of Installed Power (Equivalent To 36.40 Mw Of Peak Power), And Its Evacuation Infrastructures, In The Municipalities Of Albillos, Arcos De La Llana, Buniel, Cavia, Cayuela, Estépar, Rabé De Las Calzadas, San Mamés De Burgos, Tardajos And Villalbilla De Burgos, In The Province Of Burgos, Promoted By The Company "Green Capital Development Iii, S.L." Are Submitted To Public Information. Code Peol-Fv-036.
Announcement By The Department Of Industry And Energy Of The Government Delegation In Castilla-La Mancha On The Public Information Of The Application For Prior Administrative Authorization And Administrative Authorization For Construction Of The Self-Consumption Project Consisting Jointly Of A 48.02 Mw Hybrid Photovoltaic Installation, Called "Autoconsumo Puertollano Refino" And A 4 Mw Hybrid Storage Module Called "Bess Autoconsumo Puertollano" Together With Its Evacuation Infrastructure, Located In The Municipality Of Puertollano, Ciudad Real, Whose Petitioner Is Repsol Petróleo, S.A.
Correction Announcement Of The Construction Project Of Virtual Simulation Training Room Of Construction Engineering Of Water Conservancy And Hydropower College Of Xinjiang Shihezi Vocational And Technical College
Study Of Effects Of Erdeneburen Hydro Power Station Project Activities On Mammals