Summary:
Construction work on the access ramp to the modular conveyor belt for the plants of (Dioila, Koutiala 4, Sikasso 2 and Koumantou) including truck rollover protection profiles Country:
Mali
Notice Type:
Procurement Plan Deadline:
24 Apr 2025 Posting Date:
04 Mar 2025 |
Summary:
Construction of 7 km of 33KV HTA line in Aster 117mm2 Koumantou factory; Reinforcement of 15KV HTA power line in Aster 117 mm2 Bougouni 2 factory; Installation costs Fuel distributor pump new Dioila bridge; General maintenance MT HOLDING 250KVA transformer; REMOCUT HD plasma cutting tables (Fana Boilermaking Workshop); Maintenance Boilermaking Workshop Fana Country:
Mali
Notice Type:
Procurement Plan Deadline:
24 Apr 2025 Posting Date:
04 Mar 2025 |