Similar tenders from other countries.
Showing 1 to 20
Renewal Of Lille Tramway Carriages - Adaptation Of Line System Equipment - Track Equipment
Modernization Of The Brno-Židenice Railway And Modifications To The Brno-Maloměřice Railway
Design (In The Scope Of The Srk And Telecommunications Industry) And Execution Of Works For The Task Entitled: "Section 1 - Construction Works On The Railway Line No. 201, Maksymilianowo Station" As Part Of The Project "Works On The Maksymilianowo - Kościerzyna Section"
Construction of the Railways Section Vore - Hani I Hotit railway, including civil works and E&M for signalling, telecommunication
Renewal Of Lille Tramway Carriages - Adaptation Of Line System Equipment - Track Equipment
Renewal Of Lille Tramway Carriages - Adaptation Of Line System Equipment - Track Equipment
Execution Of Construction Works On Railway Line No. 7, Section Warsaw Wawer – Otwock Within The Framework Of The Project Entitled: “Works On Railway Line No. 7 Warsaw Wschodnia Osobowa – Dorohusk, On The Section Warsaw – Otwock – Dęblin – Lublin, Stage Iib” (Warsaw Wawer – Otwock)
Increasing Economic Efficiency And Railway Safety By Increasing The Level Of Centralization Of Railway Signalling Installations – 8 Lots: Lot 7 – Railway Stations: Lot 2– Regional Branch Of The Railway Company Craiova” - Railway Stations Amaradia And Bascov
Market Relating To Assistance With Project Management Of Spl Grand Est Mobilités As Part Of Support For The Implementation Of Railway Competition On Behalf Of The Region
Market Relating To Assistance With Project Management Of Spl Grand Est Mobilités As Part Of Support For The Implementation Of Railway Competition On Behalf Of The Grand Est Region
Design And Execution Of Construction Works For The Task Entitled: Works On Railway Line No. 1 On The Section: Koluszki - Częstochowa Carried Out As Part Of The Project "Works On Railway Line No. 1 On The Sections: Koluszki - Częstochowa And Zawiercie - Dąbrowa Górnicza"
Drafting Of Construction Project And Execution Of Works For The Renovation Of Security Facilities At Alcover Station.
Increasing Economic Efficiency And Railway Safety By Increasing The Level Of Centralization Of Railway Signalling Installations – 8 Lots: Lot 3 – Regional Branch Of The Railway Company Brașov” (Design And Execution) Sublot 1 - Războieni – Târgu Mureș - Line Cf 316 Deda – Războieni; Sublot 2 - Sibiu – Vințu De Jos – Line Cf 210 Sibiu – Vințu De Jos.
Repair/Fabrication/Supply Works Of 21 Items For Different Type Of Equipment Of Zonal Workshop-C.
Construction And Modernization Of Railway Infrastructure In Connection With The Planned Construction Of An Integrated Transfer Hub In Bielsko-Biała.
Drafting Of The Construction Project And Execution Of Works For The Renovation Of The Security Facilities At The Alcover Station
Increasing Economic Efficiency And Railway Safety By Increasing The Level Of Centralization Of Railway Signaling Installations -8 Lots: Lot 1 - Railway Sectors: Lot 1-Regional Railway Branches Bucharest And Craiova (Design And Execution)
"Execution Of Works For The Task Entitled: "Construction Of The Second Railway Track Together With The Second Bridge Crossing Over The Warta River On The Section Of Railway Line No. 354 From The Oborniki Wielkopolskie Most Branch Station To The Oborniki Wielkopolskie Station" Implemented As Part Of The National Recovery And Resilience Plan"
Increasing Economic Efficiency And Railway Safety By Increasing The Level Of Centralization Of Railway Signaling Installations - Lot 4 - Railway Sectors: Lot 4 - Regional Branches Of Iași And Galați Railways - Design And Execution
Sporirea Eficienței Economice Și A Siguranței Feroviare Prin Creșterea Nivelului De Centralizare Al Instalațiilor De Semnalizare Feroviară -Lot 4 – Sectoare Cf: Lotul 4 – Sucursalele Regionale Cf Iași Și Galați- Proiectare Și Execuție