Summary:
DEVELOPMENT OF RASAU WATER SUPPLY SCHEME (STAGE 2), SELANGOR DARUL EHSAN Package 6: Design and Build of Proposed New Ground Reservoir, Connecting Pipelines, Retrofitting Pipeworks, Access Roads at Bukit Tampoi; Treated Water Pumping Mains from existing Pipe Bridge at ELITE Highway to Bukit Tampoi Reservoir; and Associated Works. Country:
Malaysia
Notice Type:
Prequalification Deadline:
22 Oct 2024 Posting Date:
13 Sep 2024 |