E16 Lærdal Tunnel - Tunnel Upgrade
Supply With Agricultural Mechanism; Procurement Courses - Tunnel -Shaped Greenhouse Supply, Supply With Agricultural Mechanism
Electrical And Mechanical Works For The Mujib Dam Tunnel
Service For Modeling Rolling Stock Evacuation Processes In Tunnels Considering The Human Factor.
Oblique Bore Tunnels
Package No. 79: Supply And Installation Of Additional Central Tunnel Equipment -140
Renovation Of The Niels Stensen School - Civil Engineering Work
(Provia Id 136555) Föderlach; Construction Of Underpass In Km 155.140 As Well As Ek Abandonments, Km 154.764 And Km 155.786; Building; Builder'S Work - Main Work
New Shunde District Lungui Road Project (Heng 1St Road - Heng 5Th Road Section) - Tanzhou Tunnel And Fochen Road Node B Ramp Change And Delay Announcement Project Construction | Highway Tender Announcement, Prequalification Announcement Foshan City Public Resource Transaction Information Comprehensive Platform Release Time: 2025-10-13
Olten Hammer District Connection - New Construction Of Passenger Underpass, Walkways And Connection Areas
Redesign Of The South Axis; Factory Lines
Term Contract For Cleaning Of Underground Tanks And Pump Sumps At East And West Airside Tunnels And South Apron Pump House, Singapore Changi Airport
Supply, installation and operation of a stationary diesel generator Building a generator room in Orabi Tunnel in Zagazig
Execution Works Of The Construction Project Of The Oural Tunnel Located On The Monforte-Lugo Section Of Line 800: A Coruña-León
E16 Lærdals Tunnel - Upgrading Of Tunnels
25Fei79317_Renewal Of Rauenthal Tunnel - Construction Supervision 5 Lots
(Provia Id 68183) Bai0.Amp002.03:Vienna Airport - Eastern Railway; Construction Of Connecting Route, Eia Approval Planning; Statics And Planning Tunnel Bored Pile
Announcement Of Public Bidding For The Reconstruction Of Section K54 Of Yalong Road In The Xianshuihe Reservoir Area Of The Lianghekou Hydropower Station Of The Yalong River (Jierong Tunnel) And The Reservoir Bank Treatment Project Of Sections K7 And K14 Of The Luoxia Line
Xinyang Nanwan Reservoir Affairs Center Spill Tunnel Exit Floor Water Damage Repair Project-Competitive Consultation Announcement
Package No. 20: Construction Supervision (Tunnel Items, Equipment Installation And Bridge Works: Level Ii, Level I, Special Level), Construction Drawing Design Verification