Similar tenders from other countries
Summary:
Thermal And Refractory Insulation Installation Service Country:
Colombia Estimated Cost:
COP 2336206930 Notice Type:
Tender Notice Deadline:
15 Feb 2025 Posting Date:
01 Feb 2025 |
Summary:
Renovation Of Pavilion P2 Country:
Slovakia
Notice Type:
Tender Notice Deadline:
15 Feb 2025 Posting Date:
01 Feb 2025 |
Summary:
Reconstruction Of The Sports And Recreation Building Dlhé Klčovo Country:
Slovakia
Notice Type:
Tender Notice Deadline:
15 Feb 2025 Posting Date:
01 Feb 2025 |
Summary:
Improvement Of The Energy Efficiency Of The Town Hall. Multi-Annual Subsidy And Close To Competitive Bidding For The Execution Of Energy Efficiency Works In Buildings And Infrastructures Linked To The Provision Of Municipal Services, Likely To Be Co-Financed By The European Union Within The Framework Of The Galicia Feder 2021-2027 Programme (Pr486D). Country:
Spain Estimated Cost:
EUR 114861 Notice Type:
Tender Notice Deadline:
03 Feb 2025 Posting Date:
01 Feb 2025 |
Summary:
Construction Of An Ra And Ri Country:
France
Notice Type:
Tender Notice Deadline:
07 Mar 2025 Posting Date:
01 Feb 2025 |
Summary:
Improvement Of The Thermal Envelope Of The Lakuntza Public School Country:
Spain Estimated Cost:
EUR 253500 Notice Type:
Tender Notice Deadline:
14 Mar 2025 Posting Date:
01 Feb 2025 |
Summary:
Improve Energy Efficiency, The Building Envelope And The Incorporation Of Insulation. In The Vertical Elements Of The Envelope, The Construction Solution Adopted Is Always The Same, To Create An External Thermal Insulation System (Sate) In The Opaque Enclosures Of The Main Building. Its Thickness Is 8, 10 Or 12 Cm Depending On The Case. In The Gaps Of The Openings, The Thickness Of The Insulation Is Reduced In Order To Be Able To Stay Within The Thickness Of The Frames Of The Carpentry And Thus Eliminate The Thermal Bridge In Jambs, Lintel And Sill. Regarding The Finish Of These Walls, In Most Facades A Ceramic Baseboard Is Planned To Improve Their Durability, And The Rest Of The Surface Is Solved With A Thin-Layer Organic Finish. Secondly, Regarding The Horizontal Elements, We Find Different Systems To Incorporate Insulation In The Existing Elements. In Summary, We Find Three Types Of Constructive Solution: The First When The Roof Has An Air Chamber, The Second When The Roof Is Inclined And In Direct Contact With The Outside And Finally We Have A Part Where There Is A Registerable False Ceiling But Without Insulation. In The First Case, The Insulation Is Achieved By Blowing The Necessary Thickness Of Insulation From The Upper Part Of The Roof In Order To Avoid Interference With The School. In The Second Case, The Solution Involves Adding A False Ceiling That Incorporates The Required Insulation And, In The Last, Insulation Will Be Added Above The Existing False Ceiling. There Is Also A Series Of Interventions Focused On Reducing Overheating Of The School Classrooms, Which Do Not Have Any Cooling System. In This Way, The Comfort Of Users Will Be Improved, Especially In The Hot Months. It Is Proposed To Reduce Incident Radiation Through Two Different Shading Systems. Country:
Spain Estimated Cost:
EUR 310424 Notice Type:
Tender Notice Deadline:
20 Feb 2025 Posting Date:
01 Feb 2025 |
Summary:
Drywall Ceilings - New Skin And Eye Clinic Country:
Germany
Notice Type:
Tender Notice Deadline:
04 Mar 2025 Posting Date:
01 Feb 2025 |
Summary:
Postwegschule, New Cafeteria And Ogs Building - Drywall Work Country:
Germany
Notice Type:
Prior Information Deadline:
31 Jan 2026 Posting Date:
01 Feb 2025 |
Summary:
Procurement Of Capital Repair Works For The Administrative Building Of Imishli Dost Branch Country:
Azerbaijan
Notice Type:
Tender Notice Deadline:
25 Feb 2025 Posting Date:
01 Feb 2025 |