Similar tenders from other countries.
Showing 1 to 20
Hire To Prepare Tkbvtc-Dt For (09 Items) Of Mine Roads Preparing For Production At Level -97.5/-400 And 10 Items Of Mine Roads Needing Repair And Maintenance For Mong Duong Coal Joint Stock Company - Vinacomin
Coal
Feeder
Renovation Of 18 Sedimentation And Filtration Centrifuges At The Mechanical Coal Processing Plants Of Jsw S.A. Kwk "Borynia-Zofiówka-Bzie", Kwk "Budryk" And Kwk "Knurów-Szczygłowice"
Procurement Of Brown Coal For Heating Jpm (Rj Sokolac, Bijeljina And Foča)
Bowen Wharf - Reference Design And Engineering Consulting Services
Ta-6744 Reg: Accelerating The Clean Energy Transition In Southeast Asia - Sustainable Finance Coordinator (55124-001)
Purchase Of Building Materials, Peat, Coal, Stoves, Seeds And Seedlings Of Flowers, Benches And Oilcloths Haridi Masolehi Sokhtmoni, Peat, Angishtsang, Stove, Tukhmiyu Niholi Gul, Kursi Va Oilcloth
Disposal Of Coal Tar-Containing Bitumen Mixtures With And Without Asbestos Content
Purchase Estimate For The Topic: "Research On The Application Of Cermet Coating Technology Using Hvof Method To Increase The Screw Life Of The Press In The Clean Coal Manufacturing Industry"
Disposal Of Coal Tar-Containing Bitumen Mixtures With And Without Asbestos Content
Research Data Center Coal Regions - Development Of A Technical Infrastructure In The Research Data Center Of The Bbsr
National Energy Group Material Company Ningxia Coal Mtp Process Technology Upgrading And Reconstruction Project 300,000 Tons/Year Hdpe Unit Extrusion Granulator Open Tender - International Tender Announcement (2)
Deliveries To Jsw S.A. Mines Of Two-Component Adhesives For Consolidation And Strengthening Of Rock Mass With A Delivery Deadline Of 12 Months From The Date Of Conclusion Of The Contract.
Keles Coordination And Monitoring Directorate Miscellaneous Personnel Employment Service Turkish Coal Enterprises Institution General Directorate (Tki̇)
The Removal, Collection, And Disposal Of Coal And Ash From Research Testing And Development (Rt&D) To The Licensed Landfill Site For The Period Of Two (2) Years On An ‘As And When’ Required Basis.
Plan For Selecting Contractors For The Project Of Investing In Underground Power Supply System To Serve Production At -175/-300 Level Of Nga Hai Coal Mine, Adjusted
Approval Of Contractor Selection Plan For Construction Project: Fixed Asset Repair (Vkt) In 2024
Buy Bicycle Products As Gifts For Miners On Tet 2025.
Project Investment Preparation Phase: Investment In Office Building Of Khe Cham Coal Company - Tkv