Similar tenders from other countries.
Showing 1 to 20
"Specialized Consulting Services For Works/Services In 110 -750 Kv Overhead Power Lines"
Dea-42458 For The Project: Study, Supply And Installation Of Cable System And Optical Fiber Cables For The Direct Current Electrical Interconnection Of Corinth - Ko (2 X 500 Mw)
Switching To 400 Kv Voltage Of Portile De Fier – Reșita - Timișoara – Săcălaz – Arad Axis, Lea 400 Kv Timișoara – Arad Stage Iii
M St 24073 Contract For Electrical Engineering In Relation To The Extension And Redesign Of Eichendorff School, Görresstr. 2 + 4, 40670 Meerbusch
Hrm-2024-0698 - Structural Steel Enhancements - Sbc
Procurement Of Electrical Materials With Division Into Lots (02.07/3-02716/24)
Design, Supply, Installation, Testing, And Commissioning Of 4.3Mwp Solar Pv Power Plant With 6Mwh Of Battery Energy Storage System Including A 9Km Of 33Kv Evacuation Line For The National Electric Power Company (Nepco), Galkayo, Puntland State, Somalia
(2024-Eso-1176) Overhead Line Cables
Procrument of MV cables insulated with elastomers maximum voltage Um 36 kV
Procrument of Modular type HV and/or MV insulators for overhead lines
Procrument of Joints and terminals for MV cables in paper or extruded 12/36 kV
Supply and Delivery of 300MM2/3C XLPE HT Cable
F574-00Tender - Vcc - Elevator 5 Modernization
Rftc-2251-24-25-181 - Microsurfacing At Various Locations In The Towns Of Newmarket, Aurora, Whitchurch-Stouffville, East Gwillimbury And Georgina
1107 - Rtf_25_01_Cai_Vp34_Asphalt Replacement
Rfpq Pw2024-17 - Request For Pre-Qualification For General Contractor Services – Beach Area 1 Roadway Reconstruction
76Xx - Test
Contractor Selection Plan For The Project Investment Preparation Phase: "Construction Of A New 22Kv Output Line From 110Kv E1.9 Nghia Do Substation To Ct3 Nghia Do New Urban Area And Power Grid Planning In Bac Tu Liem District".
Purchasing Materials For Major Repairs Of Medium Voltage Lines In Binh Minh Power Area In 2025
Purchase of 150,000 meters of low voltage self-supporting cables - Phase 1