62 Live Notices for Poland Boilers Tenders
Showing 1 to 20
13/Da/Tr/24 Development Of Design Documentation And Obtaining A Valid Building Permit For The Project "Construction Of A High-Efficiency Gas Cogeneration System With A Capacity Of At Least 1.598 Mwe In The Stocznia Boiler Room"
Sale And Delivery Of Primary Steam Regulator Chambers Of The Second Stage Of The Op-380 Boiler No. K11 Together With Connecting Pipes To The Siekierki Power Plant In Warsaw, Including The Preparation Of Documentation
Supply Of Kaolinite For The Needs Of Enea Elektrownia Połaniec S.A. Within 12 Months
Modernization Of Boiler No. 4
Capitalized Overhaul Of The Denox Installation Of The K-16 Boiler At The Siekierki Chp Plant In Warsaw
Delivery Of Materials And Various Parts For The Repair Of Equipment As Part Of The Current Renovation Of Boilers And Auxiliary Equipment At Ec Ii In 2025.
Supply Of Materials And Various Parts For Repair Of Equipment As Part Of The Current Renovation Of Boilers And Auxiliary Equipment At Ec Ii In 2025
Comprehensive Delivery Of High-Methane Natural Gas Type E To The Central Heating Boiler Room Usk - 1 In Szczecin
Mechanical Industry Project - Boiler Modernization - Basket Installation
Renovation Of Steam And Water Boilers Together With Auxiliary Equipment At The Wrocław Chp Plant Kogeneracja S.A.
Comprehensive Delivery Of High-Methane Natural Gas Type E To The Central Heating Boiler Room Usk - 1 In Szczecin
Modernization Of The Rh1 Secondary Steam Superheater Of The Bp-2450 Boiler Of The 910 Mw Unit At Tauron Wytwarzanie Spółka Akcyjna - Branch Of The Nowe Jaworzno Power Plant In Jaworzno
Constant Supervision And Service And Operation Of Gas-Oil Boiler Rooms, Heating Stations, Solar Systems And Domestic Hot Water And Central Heating Installations In Amw Facilities As Well As The Oil Boiler Room And Heat Pumps In Aos In Czernica
Renovation And Modernization Of The Cfb Boiler At The Katowice Chp Plant
Delivery Of Gas Boilers
Concept For Heat Recovery From The Technological Process
Construction Of A Water Boiler Room
Adaptation Of The Existing Process Steam System For The Needs Of Start-Ups And Shutdowns Of The 910 Mw Unit From The Current Res Unit At Tauron Wytwarzanie S.A. - Jaworzno Power Plant Branch - Power Plant Ii.
Renovation Of Steam And Water Boilers Together With Auxiliary Equipment At The Wrocław Chp Plant Kogeneracja S.A.
Service Of Ash Blower Installation Devices For Op-230 Boiler No. 3 And 4 At Pge Energia Ciepła S.A. Branch Of The Bydgoszcz Chp Plant