31 Live Notices for Poland Drilling Tenders
Showing 1 to 20
Vhn Milling Cutter, Thread Paste, Visor Glass
Shaft (Point) For Pneumatic Hammer Sk 9-5
Gd_ Sds Drill, Sds Plus Hammer
Roller, Cover, Ring, Axle
Ti.261.03.2025 Sale And Delivery Of Water Drilling Rigs And Casings.
Drill Rod, Drill Bit
Delivery Of Directional Drilling Equipment To Jsw S.A. Kwk “Borynia-Zofiówka-Bzie” Ruch “Zofiówka”, Including A Wwh-5 Drilling Rig Or Equivalent Together With A Power Unit And The Necessary Accessories.
Carrying Out A Drilling/Pressing Under The Street
Carrying Out A Drilling/Pressing Under The Street
Milwaukee Cordless Hammer Drill
Excavation Of A Haulage Cutting For Jsw S.A. Kwk "Budryk" To Seam 405/2
"Delivery Of Drilling Equipment - Part I Underground Drilling Rig"
Delivery Of A Complete Hydraulic Drilling Rig With Directional Drilling Equipment For Pgg S.A. Zgri Branch
Performing The Function Of Contract Engineer In The Scope Of Consulting And Supervision Over The Drilling Of The Nysa Gt-1 Thermal Water Exploration And Appraisal Well In Skorochów
Delivery Of Disposable Equipment For The District Hospital In Chrzanów (Repeat)
Delivery Of Directional Drilling Equipment To Jsw S.A. Kwk “Borynia-Zofiówka-Bzie” Ruch “Zofiówka”, Including A Wwh-5 Drilling Rig Or Equivalent Together With A Power Unit And The Necessary Accessories.
Drilling Services At Jsw S.A. Plants, Including: Core Drilling, Coreless Drilling, Small-Diameter Drilling, Large-Diameter Drilling
Drilling Services At Jsw S.A. Plants, Including: Core Drilling, Coreless Drilling, Small-Diameter Drilling, Large-Diameter Drilling
Construction Works For Mining In Jsw S.A. Plants, Including: Construction Works Related To The Construction Of The Ii Parallel Junction, Level 1050 M, Drilling Of The Transport Ramp, Mining Works Related To The Drilling Of The Research Gallery 1B In The Seam 408/2/I
Construction Works For Mining In Jsw S.A. Plants, Including: Mining Works Related To The Drilling Of The Haulage Cutting To Seam 405/2 – Stages Ii And Iii, Mining Works Related To The Drilling Of The B-2 Gallery In Seam 405/2 And Connecting Cutting No. 1 Using A Roadheader, N-2 Conveyor Cutting Item 1000 (From N-2 Conveyor To N-1 Ventilation Cutting Item 1000)