23 Live Notices for Poland Mining Construction Tenders
Showing 1 to 20
Excavation In Jsw S.A. Kwk "Borynia-Zofiówka-Bzie" Movement "Borynia" Of The A-32A Gallery And The A-32 Longwall Section, Seam 405/1 Łg
Construction Of Two Dn 400 Methane Drainage Pipelines In Shaft V In The Pniówek Coal Mine
Excavation Of A Haulage Cutting For Jsw S.A. Kwk "Budryk" To Seam 405/2
Replacement Of Facade And Roof Covering
1052744 Relocation Of The Water Supply System In The Pawłów Mineral Resources Mine, Łódź Province.
Oz/261/18-Ws(Sk)/2025 Sewer Manholes Made Of Concrete Rings
Development Of Design Documentation And Implementation Of Construction Works In The “Design And Build” Formula As Part Of The Poiiś 5.1-15 Project “Unblocking The Łódź Railway Junction (Ten-T), Stage Ii, Section Łódźfabryczna – Łódź Kaliska/ Łódź Żabieniec”.
Construction Of Six Cogeneration Systems Powered By Gas From Mine Methane Drainage In Jsw S.A. Kwk "Budryk"
Excavation Of A Haulage Cutting For Jsw S.A. Kwk "Budryk" To Seam 405/2
"Securing The "Kościuszko" Shaft In The "Wieliczka" Salt Mine"
Conditions For The Execution Of Earthworks – Opencast Works In The Podgrodzie Mine
Delivery Of 1 Piece Of A Brand New And Complete Belt Conveyor With A Belt Width Of 1400 Mm And A Length Of 600 M In The First Stage Of Construction With The Possibility Of Extension To 1550 M (Conveyor With A Route Without A Transport Belt)
Installation Of Electricity Generation Modules Together With Accompanying Infrastructure At Shaft V In The Pniówek Coal Mine
Construction Works For Mining In Jsw S.A. Plants, Including: Construction Of A Methane Drainage Station At Shaft Iii
Construction Works For Mining In Jsw S.A. Plants
Construction Works For Mining In Jsw S.A. Plants, Including: Construction Works Related To The Construction Of The Ii Parallel Junction, Level 1050 M, Drilling Of The Transport Ramp, Mining Works Related To The Drilling Of The Research Gallery 1B In The Seam 408/2/I
Construction Works For Mining In Jsw S.A. Plants, Including: Construction Of A Methane Drainage Station At Shaft Iii
Construction Works For Mining In Jsw S.A. Plants, Including: Mining Works Related To The Drilling Of The Haulage Cutting To Seam 405/2 – Stages Ii And Iii, Mining Works Related To The Drilling Of The B-2 Gallery In Seam 405/2 And Connecting Cutting No. 1 Using A Roadheader, N-2 Conveyor Cutting Item 1000 (From N-2 Conveyor To N-1 Ventilation Cutting Item 1000)
Construction Works For Mining In Jsw S.A. Plants
Parts Of Machines For Cutting Coal Or Rocks, Parts For Mining And Construction Machines, Parts For Mineral Processing Machines, Sealing Heads.