25 Live Notices for Poland Photovoltaic Module Tenders
Showing 1 to 20
Price Analysis Regarding The Technical And Economic Analysis Of The Possibility Of Installing A Photovoltaic System In The Buildings Of The Zus Branch Office In Chorzów
Delivery, Assembly And Commissioning Of A Photovoltaic Power Plant With A Total Capacity Of Up To 2000 Kw On The Premises Of The Sewage Treatment Plant" As Part Of The Project "Hybrid Power Plant With A Capacity Of 4.599 Mw (Photovoltaic Power Plant Wobi 14145.1446 - 1.999 Mw, Gas Cogeneration Unit Wobi 2.6 Mw) On The Premises Of The Sewage Treatment Plant In Białystok
Renewable Energy Installations In The Gliwice District Hospital Complex Sp. Z O.O. At Ul. Niepodległości 8 In Knurów
Execution Of Construction Works Phase I At The Park And Ride P+R Połczyńska Car Park In Warsaw
Construction Of A Sports Hall At Zss - Olimpia Program - Design And Build
Purchase Of Electricity For Adam Mickiewicz University In Poznań, With Option Rights
Installation Of Photovoltaic Panels On The Roofs Of The "Repty" Buildings Of The Upper Silesian Rehabilitation Center Named After General Jerzy Ziętek In Tarnowskie Góry
Development Of Design Documentation And Construction Works In The Power Industry For The Project: Reconstruction Of The 110 Kv Kock - Radzyń Line And Adaptation Of Gpz Kock And Gpz Radzyń To Connect The Pv Wrzosów Photovoltaic Farm.
L.Dz.Osir/1.11.2024/2/E-Zp Installation Of Photovoltaic Panels And Heat Pumps – Stage Ii
Construction Of A Kindergarten For Disabled Children At Ul. Kaszubska In Jastrzębie-Zdrój
Delivery And Assembly Of Photovoltaic Micro-Installations With A Total Capacity Of Approx. 36.4 Kwp On The Premises Of Suw Grochowa And Suw Orzeszyn
Development Of Documentation And Reconstruction Of The 110/15Kv Cybinka Power Station Including Replacement Of Hv/Mv Transformers
Construction Of A Photovoltaic Farm Installation At Pge Energia Ciepła S.A. Branch Of The Bydgoszcz Chp Plant
28/R/24 Purchase And Commissioning Of A Photovoltaic Installation For The Mswia Hospital In Łódź
Design And Build: Construction Of A Glasshouse With A Renewable Energy Power Supply System And Adaptation And Modernization Of Existing Rooms For The Needs Of The New Plant Genotyping Laboratory At Ihar-Pib
Construction Of A Multi-Family Residential Building At Krzyska Street In Tarnów
Modernization Of The Tram Tracks Along With The Necessary Infrastructure In Ul. Konstytucji 3 Maja And Ul. Kościuszki.
Installation Of A Photovoltaic Installation On The Buildings Of The Heat Exchanger Station In Gliwice At Ul. Wielka Niedźwiedzicy 1, Ul. Andromedy 2B” Implemented As Part Of The “50 Kw For A Start” Program
Construction Of New Bus Stops With Bays In New Locations Along The Al. Jana Pawła Ii Road In Stalowa Wola Implemented As Part Of The Co-Financing From The Polish Agency For Enterprise Development Under The European Funds For Eastern Poland Programme 2021-2027, Priority Fepw.03 Sustainable Urban Mobility, Measure Fepw.03.01 Sustainable Urban Mobility
Construction Of A Kindergarten For Disabled Children At Ul. Kaszubska In Jastrzębie-Zdrój