19 Live Notices for Poland Power Cables Tenders
Showing 1 to 19
Renovation Of Tram Tracks, Traction Network, Supporting Structures Together With Reconstruction Of Supply And Return Traction Cables In Kosmonautów Street From The Intersection With Jeżowska Street To The “Jeleniogórska” Stop
Electrical Cables /Zkp Am804548/
Power Cables
Execution Of Electrical Installations
Design And Execution Of Construction Works On Railway Line No. 229 On The Kartuzy – Lębork Section As Part Of The Project Entitled “Ensuring Rail Access To The Lubiatowo – Kopalino Nuclear Power Plant”
Design And Execution Of Construction Works On The Gdynia Chylonia – Lębork Section Of Railway Line No. 202 As Part Of The Project Entitled: “Works On Railway Line No. 202 On The Gdynia Chylonia – Słupsk Section” - Phase Ii.
Purchase Of A Brand New Flameproof Transformer Unit Type Zto - 2X2 Or Equivalent
Renovation Of Tram Tracks, Traction Network, Supporting Structures Together With Reconstruction Of Supply And Return Traction Cables In Kosmonautów Street From The Intersection With Jeżowska Street To The “Jeleniogórska” Stop
Review Of Capacitor Banks For Reactive Power Compensation At Distribution Stations
Supply Of Patch Cables
Supply Of Equipment And Materials For The Creation Of 45 Computer Educational Labs
"Performance Of Measurements, Legalization And Periodic Tests Of Electrical Power Equipment, Including Hv, Mv And Lv Switchgear, Control And Protection Circuits, Power Cables. Part I-Iii
Power Cables
Preparation Of Documentation And Obtaining The Final Building Permit For “Construction Of Heat Pumps Supplying The Capital City Of Warsaw – In The Scope Of Technical Infrastructure For The Transmission Of Fluids (Heated Water) And Electricity, As Well As Other Facilities And Devices Necessary For The Use Of These Pipes.” – Heating Networks Including Power Cables And Optical Fiber.
Renovation Of Tram Tracks, Traction Network, Supporting Structures Together With Reconstruction Of Supply And Return Traction Cables In Kosmonautów Street From The Intersection With Jeżowska Street To The “Jeleniogórska” Stop
Design And Execution Of Construction Works On The Gdynia Chylonia – Lębork Section Of Railway Line No. 202 As Part Of The Project Entitled: “Works On Railway Line No. 202 On The Gdynia Chylonia – Słupsk Section” - Phase Ii.
Preparation Of Executive Documentation And Implementation Of Construction Works As Part Of The Project Entitled "Works On The E 75 Line On The Białystok - Suwałki - Trakiszki Section (State Border), Stage I, Białystok - Ełk Section, Phase Ii"
Maintenance Of The Pre-Selected Weighing System For Vehicles In Motion On The Dk 92 And S3 Roads, Along With Calibration And Verification Tests
Delivery And Assembly Of Cable Lines For Południowy Koncern Węglowy S.A. - Zakład Górniczy Sobieski