53 Live Notices for Poland Solar Panel Tenders
Showing 1 to 20
"Construction Of A Photovoltaic Installation And Installation Of Heat Pumps At The Lubachów Water Treatment Plant In Zagórze Śląskie."
Construction Of A Service Building With The Following Installations: Water And Sewage, Mechanical Ventilation And Air Conditioning, Electrical With Photovoltaic And Telecommunications, As Well As With Land Development And Technical Infrastructure In The Field Of Accesses, Construction Of Internal Installations In The Ground: Water Supply, Sanitary Sewage, Rainwater Sewage With A Non-Drainage Tank For Rainwater And Electrical Installation
Od Gorzów; Modernization Of Bay No. 9 In The 110/15 Kv Gpz Przemysłowa Station, Execution Of The Sn-15Kv Network Connection And The Glinik Photovoltaic Power Plant Connection. (Design + Construction)
Construction Of A Service Building With The Following Installations: Water And Sewage, Mechanical Ventilation And Air Conditioning, Electrical With Photovoltaic And Telecommunications, As Well As With Land Development And Technical Infrastructure In The Field Of Accesses, Construction Of Internal Installations In The Ground: Water Supply, Sanitary Sewage, Rainwater Sewage With A Non-Drainage Tank For Rainwater And Electrical Installation
Construction Of The Main Switchboard In The Goś-Łam Area
Connection Of The "Malice" Photovoltaic Power Plant To The Enea Operator Network. The Task Is Carried Out In The "Design And Build" Mode
Construction Of A Kindergarten For Disabled Children At Ul. Kaszubska In Jastrzębie-Zdrój
Delivery, Assembly And Commissioning Of A Photovoltaic Power Plant With A Total Capacity Of Up To 2000 Kw On The Premises Of The Sewage Treatment Plant" As Part Of The Project "Hybrid Power Plant With A Capacity Of 4.599 Mw (Photovoltaic Power Plant Wobi 14145.1446 - 1.999 Mw, Gas Cogeneration Unit Wobi 2.6 Mw) On The Premises Of The Sewage Treatment Plant In Białystok
Purchase Of Electricity
Valve Pcv1 Dr5Mk9 B8-47-Pv-001 Hale Hamilton /160039372/
Connection Of The "Żołędowo" And "Niwy 1" Photovoltaic Power Plants To The Enea Operator Network. The Task Is Carried Out In The "Design And Build" Mode.
Delivery Of 11 Electric Buses With Charging Infrastructure Using Renewable Energy
"Installation Of Renewable Energy Systems In The Municipalities Of Rzgów And Wilczyn"
Modernization Of Research Facilities: 4 Phytotron Chambers And 4 In-Vitro Rooms, Greenhouses, Powered By Renewable Energy Sources For Potato Research And Breeding Work At The Ihar-Pib Branch In Młochów
Design And Execution Of Works As Part Of The Project Entitled: "Works On The C-E 20 Railway Line On The Skierniewice - Czachówek Wschodni Section"
Connection Of The "Żołędowo" And "Niwa 1" Photovoltaic Power Plants To The Enea Operator Network. The Task Is Carried Out In The "Design And Build" Mode.
"Construction Of A Photovoltaic Installation For The Water Treatment Plant In Koźminek And Dębsko"
Strengthening The Roof Of The Production Hall Along With The Implementation Of The Project
Construction Of A 1000 Kwp Photovoltaic Farm Together With The Expansion Of The Mine'S Mv Switchboard
Construction Of Photovoltaic Farms At Two Sewage Treatment Plants And At A Sewage Pumping Station In Bytom