21 Live Notices for Poland Solar Tenders
Showing 1 to 21
Delivery Of 11 Electric Buses With Charging Infrastructure Using Renewable Energy
Comprehensive Supplies (Sales And Distribution) Of Electricity Necessary For The Proper Functioning Of Sp Zoz Mswia Buildings In Krakow, Tarnów And Nowy Sącz
Construction And Commissioning Of A Photovoltaic Installation With An Energy Storage With A Connection Capacity Exceeding 150 Kwp At The Rolling Stock Maintenance Point In Wągrowiec At Ul. Leśna 1D
Thermal Modernization Of The Milenium Recreational Complex In Kołobrzeg
Delivery Of Seals For Compressor Units - Procedure Divided Into Two Parts
Constant Supervision And Service And Operation Of Gas-Oil Boiler Rooms, Heating Stations, Solar Systems And Domestic Hot Water And Central Heating Installations In Amw Facilities As Well As The Oil Boiler Room And Heat Pumps In Aos In Czernica
Delivery, Assembly And Commissioning Of A Photovoltaic Power Plant With A Total Capacity Of Up To 2000 Kw On The Premises Of The Sewage Treatment Plant" As Part Of The Project "Hybrid Power Plant With A Capacity Of 4.599 Mw (Photovoltaic Power Plant Wobi 14145.1446 - 1.999 Mw, Gas Cogeneration Unit Wobi 2.6 Mw) On The Premises Of The Sewage Treatment Plant In Białystok
Installation Of Photovoltaic Panels On The Roofs Of The "Repty" Buildings Of The Upper Silesian Rehabilitation Center Named After General Jerzy Ziętek In Tarnowskie Góry
Construction Of Photovoltaic Farms At Two Sewage Treatment Plants And At A Sewage Pumping Station In Bytom
Expansion Tank
Delivery And Assembly Of A Photovoltaic Micro-Installation With A Capacity Of Approx. 50Kw And A Small Photovoltaic Installation With A Capacity Of Approx. 150Kw In The Town Of Naprawa, Jordanów Commune, Suski District.
Purchase Of Electricity For The University Of Life Sciences In Poznań
Design And Delivery Of Photovoltaic Installations, Energy Storage Facilities And Air Heat Pumps As Part Of The Investment Project Entitled "Renewable Energy Sources In The Rusiec Commune - Edition 2"
Design And Execution Of Works Within The Project Nitered "Design And Execution Of Works On The C-E 20 Railway Line On The Czachówek Wschodni - Pilawa Section Along With A Bridge Over The Vistula.
,,Preparation Of Design Documentation And Construction Works Related To Photovoltaic Systems, Solar-Wind External Lighting System With Back-Up Based On Central Energy Storage Powered By Renewable Energy Sources (Pv) On The Premises Of The Upper Silesian Medical Center Named After Prof. Leszek Giec Of The Silesian Medical University In Katowice''
Delivery, Assembly And Commissioning Of A Photovoltaic Power Plant With A Total Capacity Of Up To 2000 Kw On The Premises Of The Sewage Treatment Plant" As Part Of The Project "Hybrid Power Plant With A Capacity Of 4.599 Mw (Photovoltaic Power Plant Wobi 14145.1446 - 1.999 Mw, Gas Cogeneration Unit Wobi 2.6 Mw) On The Premises Of The Sewage Treatment Plant In Białystok
Modernization Of The Tram Tracks Along With The Necessary Infrastructure In Ul. Konstytucji 3 Maja And Ul. Kościuszki.
Installation Of Four Complete Air Heat Pump Installations And Photovoltaic Installations Together With An Energy Storage For Public Utility Buildings Of The Porąbka Commune In The "Design And Build" Formula
"Construction Of A Photovoltaic Installation And Installation Of Heat Pumps At The Lubachów Water Treatment Plant In Zagórze Śląskie."
Renewable Energy Installations In The Gliwice District Hospital Complex Sp. Z O.O. At Ul. Niepodległości 8 In Knurów