Similar tenders from other countries.
Showing 1 to 20
Musina Water Development Project: Phase 3 - Module 1: Technical Feasibility Study For A Period Of 36 Months .
Director Of The Gare District (Public Spaces, Housing, Economic Activities, Business Tourism) & Study Of Urban Programming And Feasibility Islet Because
Quotation Event For The Provision Of The Consulting Service For The Management Of The Automotive Park Of The Mayor'S Office Of Santiago De Cali.
Feasibility And Programming Study For A Turballe -Auction To The Turballe (44420)
Provision of Toll Review for Government Tunnels – Feasibility Study
PROVISION OF CONSULTANCY SERVICES FOR FEASIBILITY STUDY FOR THE ESTABLISHMENT OF AN ANIMAL FEEDS PLANT IN KIAMBU COUNTY
Provision of Feasibility Study for Logistics Readiness of Green Hydrogen Projects for Asyad Group
Provision of Interdisciplinary Qingdao Study Trip
Contracting of services to carry out 31 soil studies and 55 permeability studies, in different centers National Educational Level
Recruitment of a Consultant (Firm) for (i) Technical studies of road paving works at the BUJUMBURA City Hall, (ii) Development of environmental and social instruments for moderate risk roads, and (iii) Supervision of works
Providing consulting services Study, design, preparation and preparation of tender documents and supervision
Opportunity And Feasibility Study For The Establishment Of Local Logistics Functions In The Public Car Parks Of The Metropolis Of Grenoble
Métis-Owned Credit Union Feasibility Study
Feasibility Study And Space Needs Assessment
Feasibility Studies On Renewable Energies
Feasibility Study And Definition Of An Interpretation System For The Landing Beaches, Normandy, 1944
10006092 - Update On The Search Study And Cost Benefit Of The International Corridor Sul Sines/Setúbal/Lisboa -Caia
Yanggao County Public Utilities Service Center Yanggao County Street Drainage Network Rainwater And Sewage Source Treatment And Wrong Connection And Mixed Connection Reconstruction Project Feasibility Study.
Development Of A Feasibility Study (Fs) For The Project “Phased Modernization In 2025-2028.
Framework Agreement For Feasibility Study And Costing Missions For Infrastructure Works And Development Of Roads And Various Networks.