118 Live Notices for Qatar Scada Tenders
Showing 1 to 20
Maintenance Of The Scada System On The Highway
Reformulation Of Technical Supervision Of Infrastructures – Lisbon Intermodal Station
Corrective Maintenance Of The Monitoring And Control System Of The Dredging Pipe In The Ihc-Dtps System, Ihc-Dlm-Stpm Section Inlet-Depth System, Scada System Of The Dredging Force Sub-System And Steering System Due To Failure In The Automatic Pilot Of The Francisco De Orellana Dredger
Modernization Of Scada In Oporen Point With Introduction Of Remote Redundancy Capability
Procurement Of Consulting Services For The Improvement Of The Scada System Within The Framework Of The Azerbaijan Republic Renewable Energy Expansion Project (Azure). Participation Fee: 350 Azn. Application Deadline: 04.10.2024. Contact Person: Araz Mammadzade - Senior Specialist. Tel.: (+994 12) 490-09-27; Tel.: (+994 12) 598-05-56. E-Mail: Araz.Mammadzade@Azerenerji.Gov.Az
Subscription-Based Telemetry Service For Reading Energy Meters
Supply Of Level Indicator Transmitter (Lit) & Related Others For Dtws Scada System Maintenance
Contractor Selection Plan Package: Consulting And Supervising The Installation Of Equipment And Construction Of Fiber Optic Cable Lines In Ben Tre Province For 03 Projects: 1/ Construction Of Fiber Optic Cable Lines To Improve The Reliability Of Information Systems, Scada Transmission Lines Of Unmanned 110Kv Substations Operating According To N-1 Criteria; 2/ Investment In Fiber Optic Cable System Connecting Relays According To Project 100 - Ben Tre Province; 3/ Investment And Renovation Of Ac/Dc System
Scada Data Acquisition Boards With Rtu
Annual Maintenance Work Of Scada System Of Linkou Power Plant
Order Of Services
Migration Of The Ibms Fire Protection Visualization Scada System At Pge Energia Ciepła S. A. Branch No. 1 In Krakow
Db-Cl-02 Water Sources, Reservoirs, Chlorination Stations, Pumping Stations, Intakes For Titu, Conțesti, Răcari, Lungulețu, Potlogi, Odobești, Ciocănești, Slobozia Moăra, Produlești
Supply, Installation and Backup Power System, Two UPS's for SCADA System at CND
Replacement Of Valves With Respective Installation Of Actuators And Integration Into The Scada System Of The Ccm Phase 1 Of The Potable Water Treatment Plant Of Public Companies Of Armenia Esp
Cazanesti, Fetesti, Tandarei Water Sources. Treatment Stations Cazanesti, Dridu, Fierbinti Targ, Fetesti, Tandarei. Rehabilitation Of Fetesti, Tandarei, Cazanesti Reservoirs. Rehabilitation Of Cazanesti, Dridu, Fetesti, Tandarei Pumping Stations"
Modernization Of The Visualization Control System Of Cold Rooms
Klaipėda City Acquisition And Installation Of Energy-Efficient Pumps For The 2Nd Lift Of The 3Rd Watering Hole
Realization Of Supervision Over Joint 6 Kv Plants Of Tpp Tuzla As Part Of The Backup Scada System Of Electrical Control
Project: Upgrading Data Point Copyright For Scada/Dms Survalent System At Dong Nai Control Center