216 Live Notices for BIM招标
Showing 1 to 20
Mof 3 - Mönchengladbach Hbf, New Construction Of Platform 2 (Bim Based)
Construction Framework Agreement Expert Services For The Period 1.1.2025 (Target)-31.12.2026 + Two-Year Option
Report Bim And Geotechnical Support Karlsruhe-Basel Pfa 8.5-8.9
Fsq Bim Planning Environmental Services
Spgk - Bim To Build - Renewal Of Eü Else Str 2981, Km 8,422
Single Design-Build Market In Procedure With Negotiation For The New Construction Of 90 Dwellings And 1700 M² Of Activity On The Ground Floor In Bim Approach - Nf Habitat Hqe And Re 2020 Threshold 2025 - Zac De St Louis In Marseille (15Th)
Spgk - Bim To Build - Renewal Of Eü Else Str 2981, Km 8,422
Bim Planning Abs Uelzen - Stendal - Magdeburg - Halle (East Corridor North)
Amo Bim Manager As Part Of The Operation Creation Of The 3Rd Bus Depot-Floirac
Bim Planning Of Combined Immersed Tunnel Fsq, Hoai Lph 3-4, Optional Lph 6-7
Single Design-Build Market In Procedure With Negotiation For The New Construction Of 90 Dwellings And 1700 M² Of Activity On The Ground Floor In Bim Approach - Nf Habitat Hqe And Re 2020 Threshold 2025 - Zac De St Louis In Marseille (15Th)
Amo Bim Manager As Part Of The Operation Creation Of The 3Rd Bus Depot-Floirac
Amo Bim Manager As Part Of The Operation Creation Of The 3Rd Bus Depot-Floirac
Amo Bim Manager As Part Of The Operation Creation Of The 3Rd Bus Depot-Floirac
Abs/ Nbs Karlsruhe-Basel, Section 8A (Nbs), Planning Phases 6-7 In Bim For The Pfa 8.0-8.47
Expansion Of Cologne Junction – Westspange, Electrification Of The Eifel Route, Pa3: Hürth-Kalscheuren To Euskirchen; Bim Planning Phases 1+2, Option Phases 3+4
Construction Of A Logistics And Distribution Center For Fruits And Vegetables In Požega
In The Processes Of Creating, Modifying And Disseminating Technical Drawing Documents, The City Council Uses Different Types Of Cad Software, In Accordance With The Rights Of Use Granted By The Current Software License Subscriptions, Which Also Allow For Version Updates And Patches. Once The Need To Continue Using This Software In The Coming Years Has Been Established, It Is Considered Essential To Continue The Corresponding Subscriptions. On The Other Hand, The City Council Has Adopted The Use Of The Openbim Methodology, A Collaborative Work Methodology For The Creation And Management Of Projects And Works, Which Requires Bim Tools That Are Specially Designed To Manage And Work With Ifc Models Efficiently, With The Ability To Read, Edit And Import/Export Ifc Models, Ensuring High Interoperability And Avoiding Data Loss.
Contract For The Technical Management Of The Works Planned In The Urbanization Project Of The Au Lo.01.1 Garden City Of Loiola Using Bim Technology
Package 7: Consulting On Survey, Preparation Of Feasibility Study Report; Environmental Impact Assessment; Survey And Calculation Of Riverbank Erosion, Erosion Of Phu Da And Phu Binh Islets; Application Of Bim When Preparing Feasibility Study Report