189 Live Notices for 生物质量招标
Showing 1 to 20
Framework Agreement For The Supply, Installation, Commissioning And Warranty Service Of Alternative Heating Devices For Domestic Heating, Including Steel Radiators, Under The Project "For Cleaner Air In The Municipality Of Veliko Tarnovo, By Replacing Solid Fuel Heating Devices With Eco-Friendly Alternatives" Financed Under Procedure No. Bg16Ffpr002-5.001 "For Cleaner Air!" Under Priority 5 "Air" Of The "Environment" Program 2021-2027.
Thermo Electron Essential Plan Service Agreement
Auction Of Wood And/Or Biomass From The Works Hu_Ttsspp22_01 And Hu_Ttsspp22_03 Promoted By The Department Of Sustainability And Environment In Mountains Included In The Integral Management Plan For The Public Mountains Of El Mustio In The Province Of Huelva. Year 2024.
Biomass Heating Network For Sports Equipment At The Urgell Headquarters
Material Use Of Biogenic Residues And Waste Materials
“Collection And Management Of Municipal Waste From The Przemyśl Commune In 2024.”
Delivery And Installation Of A Biomass Pyrolysis Reactor
Installation Of A Biomass Boiler And Tank To Heat The Water In Two Swimming Pools At The Illes Balears Sports Development Centre (Cteib)
Floating Wetland - Plant Nutrient Biomass Research
Works To Install A Biomass Boiler In The Gorosabel Zaharra Building In Tolosa, Within The Framework Of The Recovery, Transformation And Resilience Plan, Financed By The European Union - Next Generation Eu.
Technical Management And Health And Safety Coordination Of The Works To Install A Biomass Boiler In The Gorosabel Zaharra Building In Tolosa, Within The Framework Of The Recovery, Transformation And Resilience Plan, Financed By The European Union - Next Generation Eu.
Multi-Lot Study Walk: Thermal Study, Renewable Energy Feasibility Study, Indoor Air Quality Study And Regulatory Dpe
Multi-Lot Study Walk: Thermal Study, Renewable Energy Feasibility Study, Indoor Air Quality Study And Regulatory Dpe
Active Conservation Measures In Non-Forest Wetland And Meadow Ecosystems In The Upper Basin Of The Biebrza Valley In The Biebrza National Park And The Park Buffer Zone
Works To Install A Biomass Boiler In The Gorosabel Zaharra Building In Tolosa, Within The Framework Of The Recovery, Transformation And Resilience Plan, Financed By The European Union - Next Generation Eu.
Technical Management And Health And Safety Coordination Of The Works To Install A Biomass Boiler In The Gorosabel Zaharra Building In Tolosa, Within The Framework Of The Recovery, Transformation And Resilience Plan, Financed By The European Union - Next Generation Eu.
Execution Of Works Within The Project: Energy Renovation Of The Baia De Aramă City Hospital
Innohof - Timber Construction Work
Technical And Consulting Services
Hydraulic Installation And Integration Of Heat Generators Biomass, Heat Pumps, Solar Thermal Energy, Chp Including System Peripherals Of An Energy Center For Connection To A District Heating Network