1529 Live Notices for 锅炉招标
Showing 1 to 20
Repair And Maintenance Of Coal Fired Boilers, Steam And Condensate Reticulation, Water Treatment For Boilers And Autoclaves, Calorifiers And Related Electro-Mechanical Equipment At Various Hospitals Of The North West Provincial Department Of Health For A Period Of 48 Months. Cidb Grading 6Me Or Higher
Maintenance Of Soot Blower And Boiler Fans For A Period Of Five (5) Years At Matimba Power Station - Extended As Per Addendum
Maintenance Of Soot Blower And Boiler Fans For A Period Of Five (5) Years At Matimba Power Station - Extended As Per Addendum
25-033 Fire Alarm Inspection Rfq
Y1Dz--523A4-20-208 Replace Boilers And Upgrade Controls
Water Treatment Chemical
Cac Heating And Roofing
Cac Heating And Roofing
Dscr B60 Replace Boilers & Wh8 Boilers
Z2Da--542-23-105 | Temporary Boiler Stub-Outs | Nco 4 Construction East (Va-25-00031452)
Boiler / Heating Plant Servicing April 2025 To March 2028
Clinker Branch Factory External Processing Actuator Turbines And Worm Rods
Partial Replacement Of Internal Insulation Of The Recovery Boiler, In Pge Ec S.A. Elektrociepłownia Branch In Lublin Rótków
Performing Repairs With The Replacement And Maintenance Of The Laundry Gas Boiler Room Equipment At The Police Academy In Szczytno With The Configuration Of The Entire System.
2/04/2025 "Reconstruction Of A Heat Node Cooperating With An Air Heat Pump On The Air Pump Of The Heat Pump Cooperating With A Cascade Of External Condensing Gas Boilers"
Mkuo Pronature Zp/Tp/23/25 Delivery And Launch Of The Boiler Supply Water Pump
Adaptation And Modernization Of The Boiler
Performing Tests Of Non -Destructive Welded Connectors
Electric Boiler
Project Management Market Relating To The Study And Monitoring Of The Realization Of The Downgrading In Low Pressure Of The Heat Network And High Pressure Boilers Of Wrapping - Application Phase.