95 Live Notices for 炸弹招标
Showing 1 to 20
Construction And Installation Of Works (Phase 1 - Technical Infrastructure Of Residential Area)
Tv9 Package: Consulting On Technical Design Review And Estimate Review
Tv8 Package: Consulting And Supervising The Survey Work Of Technical Design Step
Package 01: Consulting On Survey, Construction Design Implementation After Basic Design And Construction Estimate
Construction Supervision Consultancy
Package No. 06-Bk: Setting Up Gpmb Markers And Demarcating The Protection Scope Of The Project
Package 1: Consulting On Survey, Construction Drawing Design And Estimate
Object: Electronic Auction - Future And Eventual Contracting Of A Company Qualified To Supply Maintenance Material In Order To Meet The Needs Of The Requesting Departments, With Regard To Carrying Out Emergency Building Maintenance, According To The Specifications Listed In The Terms Of Reference, An Integral Part As Annex I And Other Annexes That Make Up The Notice.
Package 06: Consulting On Survey, Preparation Of Construction Drawings And Estimates
Package 4: Prepare Construction Drawing Design And Construction Estimate
External Development Of Oberbillwerder - Specialist Planning And Monitoring Of Explosive Ordnance Disposal
External Development Of Oberbillwerder - Specialist Planning And Monitoring Of Explosive Ordnance Disposal
Package 9: All Construction
Package 02: Construction Drawing Design - Estimate
Package No. 06: Consulting On Topographic Survey, Construction Drawing Design And Project Estimate (Phase 1)
Package No. 18: Consulting On Survey, Design Of Construction Drawings And Project Estimates (Section Km6+641-Km14+800 And Section Km21+280-Km24+500
Package 02: Consulting On Design Review Of Construction Drawings And Project Estimates
Package 01: Consulting On Survey, Construction Drawing Design And Project Estimate
Package 01: Consulting On Survey, Construction Drawing Design And Project Estimate
Package 01: Consulting On Survey, Construction Drawing Design And Project Estimate