Toggle Offcanvas
...
 
淡化设备招标

淡化设备招标

查看海水淡化设备招标,RFP和合同。自2002年以来,竞标具有最佳,最全面的招标平台的随时可用的淡化设备招标。 竞标对各种规模的公司的淡化设备招标非常有利可图。招标当局和私人公司释放了数千份价值数百万美元的合同,用于采购海水淡化。

全球招标是致力于招标和政府合同的最大平台。全球台人拥有超过20年的招标业务经验,提供了最广泛,最可靠的招标/RFP/合同数据库。该平台汇总了公共和私人资源的合同,与超过50万买家的庞大网络建立了联系。我们细致的过程采用了先进的人工智能,涉及从十万来源收集信息。然后,将数据智能分类为数千个子类别,以方便过滤并以用户友好的格式显示,以快速理解。

除了招标信息外,我们还提供深入的淡化设备市场分析,出价咨询服务以及对顶级投标者和获胜者的见解。 立即注册以立即访问无限的淡化设备招标,高级搜索过滤器,市场分析,行业趋势,招标培训和24/7客户支持。

11 Live Notices for 淡化设备招标

Showing 1 to 11

Inverse Osmosis Membranes Supply For The Edam Of Janubio And Edam Díaz Rijo Of The Insular Consortium Of The Lanzarote Water.
country Spain
posting date28 Mar 2025
deadline14 Apr 2025
Invitation To Bid For The Supply Of Water Treatment Equipment & Supplies
country United States
posting date28 Mar 2025
deadline10 Apr 2025
Tay10/2025 Design, Build, Operate, Maintain And Transfer Of A Water Treatment Plant For The Garyllis Aquifer To Produce Drinking Water For 5 Years
country Cyprus
posting date19 Mar 2025
deadline11 Apr 2025
Tay10/2025 Design, Build, Operate, Maintain And Transfer Of A Water Treatment Plant For The Garyllis Aquifer To Produce Drinking Water For 5 Years
country Cyprus
posting date19 Mar 2025
deadline11 Apr 2025
Hiring Of The Supply And Commissioning Of Material For The New Desalination Module In The Project Of Modernization And Improving Irrigation In The Downtown Area Of ​​Fuerteventura, Ttmm Of Tuineje Y Pájara, Island Of Fuerteventura, Within The Framework Of The Recovery, Transformation And Resilience Plan Funded By The European Union, Nextgeneu.
country Spain
posting date19 Mar 2025
deadline16 Apr 2025
Hiring Of The Supply And Commissioning Of Material For The New Desalination Module In The Project Of Modernization And Improving Irrigation In The Downtown Area Of ​​Fuerteventura, Ttmm Of Tuineje Y Pájara, Island Of Fuerteventura, Within The Framework Of The Recovery, Transformation And Resilience Plan Funded By The European Union, Nextgeneu.
country Spain
posting date18 Mar 2025
deadline16 Apr 2025
Supply And Installation Of A System For The Production Of Demineralized Water For The Hestambiente Waste -To -Energy Plant In Padua.
country Italy
posting date12 Mar 2025
deadline16 Apr 2025
Supply of 54 reverse osmosis membranes RO desalination unit required in units 3, 4 At Sidi Kerir power station
country Egypt
posting date11 Mar 2025
deadline05 Apr 2025
Supply, Installation And Commissioning Of A Pilot Reverse Osmosis Desalination Plant For Seawater With A Double Stage, With A Minimum Flow Rate Of 6 M3/H And A Minimum Recovery Of 55%, For Research And Demonstration Purposes At The Itc Facilities In Pozo Izquierdo, Within The Framework Of The Bluegreencycle Project (Exp.:Apd-2309).
country Spain
posting date04 Feb 2025
deadline03 Feb 2026
Supply, Installation And Commissioning Of A Pilot Reverse Osmosis Desalination Plant For Seawater With A Double Stage, With A Minimum Flow Rate Of 6 M3/H And A Minimum Recovery Of 55%, For Research And Demonstration Purposes At The Itc Facilities In Pozo Izquierdo, Within The Framework Of The Bluegreencycle Project (Exp.:Apd-2309).
country Spain
posting date01 Feb 2025
deadline31 Jan 2026
Lrps-2025-9196597 Technical Assessment And National Campaign Design For Rapid Energy Efficiency Upgrades Of Centralized Water Supply And Sanitation Systems
country Ukraine
posting date03 Apr 2025
deadline23 Apr 2025

Share Share this page