105 Live Notices for 电力继电器招标
Showing 1 to 20
Preventive And Corrective Maintenance Of The Air Conditioning System
59--Relay,Electromagnet
59--Relay,Electromagnet
59--Relay,Thermal
59--Switch,Proximity
12508731 Standard
Procurement Of Electrical Consumable Goods ( Tube Light,Ceiling Fan,Magnetic Contact,Relay Etc) For Fenchuganj Combined Cycle Power Plant
61--Yfo Toppenish Boskar Rake Repair Parts
Yfo Toppenish Boskar Rake Repair Parts
Supply And Delivery Of Strategic Spares (Overcurrent & Earth Fault Relays, Frequency Protection Relays, Synchronising Relays And Signal Annunciators)
59--Relay,Electromagnet
59--Switch,Liquid Level
59--Relay,Electromagnet
59--Relay,Electromagnet
61--Controller,Hoist
59--Relay,Electromagnet
61--Motor,Control
59--Relay,Electromagnet
Product/Service Quant. Unit Product/Service: Autoclave Maintenance Description: Preventive And Corrective Maintenance Service: Equipment: 02 Autoclaves Model 1020I Sercon. 02 Autoclaves Items Evaluated To Be Evaluated: Water Pump; Temperature And Pressure Indicator System; Microprocessor Controller; Digital Or Analog Thermometer; Steam Gauge; Manovacuometer; Compressed Air Gauge; Filter Y; Vacuum / Ar Break Filter; Hydrophobic Bacteriological Filter; Water Filter; Solenoid Valves; Pneumatic Valves; Retention Valve; Pressure Transmitter; Pt 100 Type Sensor; End Of Course Sensor Sensor; Thermal Relays; Safety Valves; Pressurects; Thermostats. Preventive Maintenance Drain The Steam Generator For Cleaning It. Verification Of Pressure From The Pressure Of The Pressure. Verification The Grounding Of The Equipment. Verification The Operation Of Solenoid Valves. Verification The Door Drive System. Verification The Filtering Elements. Cleaning The Cabinet Externally. Cleaning Steam Generator Level Electrodes. Cleaning The Drainage System, Such As Filters, Retention Valves, Purges. Verification The Temperature And Pressure Indicators. Verification The Temperature Sensors. Check And Reapply The Hydraulic Connections. Cleaning The Internal Chamber Drine Filter. Cleaning The Inner Chamber. Cleaning The Door Garrison. Verification And Reopen The Electrical Contacts And Grounding. Verification The Lid Garrison, And Exchange If Necessary. Cleaning The Hydraulic Elements. Verification The Safety Valves. Verification The Pressure Relief Valves. 2 Unit
Universal Fuel Accessories Test Stand (Ufats)