232 Live Notices for 小径建设招标
Showing 1 to 20
Reconstruction Of The Dubois-Drobner Stop Junction Implemented As Part Of The Task Entitled "05400 - Improving The Availability Of Public Transport Stops And Connections For Pedestrians And Cyclists In The Area Of The Intersection Of Dubois - Drobnera Street"
Construction Of A Pedestrian Trail On M6, Livno-Tomislavgrad, In Žabljak, City Livno
Dobele Livonian Order Castle Garden Improvement
construction and maintenance of curbs, sidewalks, medians and traffic intersections in various locations / Part One
Invitation To Quote For Town Hall Gardens Access Improvement Works Chatham
Refurbishment Of The Rünther Straße
Invitation To Quote For Town Hall Gardens Access Improvement Works Chatham
Itinerary Peatonal'S Overview, Junto A La Carretera Gi-636. Tramo 1: Lanbarren- Polígono Industrial 107 (4-Sv-27/2025)
Refurbishment Of The Rünther Straße
Invitation To Quote For Town Hall Gardens Access Improvement Works Chatham
Repairs And Reconstruction Of Roads In The Administration Of Bratislava - Old Town 2025
Revitalization Of Sidewalks - Grinava Limbašský Brook
Reconstruction Of The Dubois-Drobner Stop Junction Implemented As Part Of The Task Entitled "05400 - Improving The Availability Of Public Transport Stops And Connections For Pedestrians And Cyclists In The Area Of The Intersection Of Dubois - Drobnera Streets"
Execution Of Act 2 “Pancrudo River Training Paths”, Within Axis 1 Of The Tourist Sustainability Plan At The Destination Of The Jiloca Region, Within The Framework Of The Recovery, Transformation And Resilience Plan, Funded By The European Union-Next Generation Eu.
UPGRADING OF PATH NEAR CANBERRA ROAD, SEMBAWANG WAY, SEMBAWANG DRIVE, ADMIRALTY DRIVE AND SEMBAWANG CRESCENT IN CANBERRA DIVISION (CONTRACT PERIOD – 09 MONTHS)
CONSTRUCTION OF BICYCLE SHED, SHELTER FOR HANDICAP RAMP, LOW LINKWAY AND RECONSTRUCTION OF FOOTPATH IN PASIR RIS CENTRAL AND PUNGGOL WEST DIVISIONS
CONSTRUCTION / UPGRADING OF COVERED LINKWAY, COMMUNITY GARDEN AND BFA RAMP IN TELOK BLANGAH DIVISION (CONTRACT PERIOD – 16 MONTHS)
DESIGN AND BUILD COVERED LINKWAYS IN FENGSHAN AND CHANGI-SIMEI DIVISIONS (CONTRACT PERIOD – 16 MONTHS)
TO CONSTRUCT DROP-OFF POINT WITH LOW COVERED LINKWAY AT BLOCK 164 BEDOK SOUTH ROAD AND ADD ANTI-SPLASH PERFORATED PANELS FOR EXISTING LINK BRIDGES AT BLOCK 761A, 765A AND 769A BEDOK RESERVOIR VIEW (CONTRACT PERIOD – 08 MONTHS)
Reconstruction Of The Central Square Of Tapa