288 Live Notices for 气计招标
Showing 1 to 20
Purchase Of Compressed Natural Gas (Automotive Gas) For Vehicles Of The Kaspi Public Utility Service.
Installation, Maintenance And Comprehensive Guarantee Of Traffic Meters And Implementation Of A Monitoring System For Water, Electricity, Gas And Fuel Oil Consumption
Technical Equipment Hls - Part 4 Section 2 Hoai
1.1.1. Medical Device - Consumables For Patient Monitoring Equipment.
2Nd Call For Request To Purchase A 25 Cubic Meters Gas Regulator From The General Directorate Of Social Economy Ex Digital: Ex-2025-00101236- -Neu-Desp#Mtdl Call For Direct Contracting (2Nd Call) With More Than One Budget No. 288/2025, For The Purchase Of A 25 Cubic Meter Gas Regulator Requested By The General Directorate Of Social Economy As Detailed In The Budget Request That Is Part Of This Document.
City Of Alma - Teresa Estates - A Rural Workforce Housing Initiative Project
Gas Used At The Osaka High Court, District Court And Summary Court Joint Government Building: Maximum Contracted Flow Rate 605 Cubic Meters/H; Planned Annual Gas Usage 436,300 Cubic Meters
operations of procurement, supply, loading, transportation and unloading of materials and the implementation of construction and commissioning of a gas station with a capacity of 10,000 cubic meters per hour, along with inlet and outlet pipes,
Natural Gas (Auto Fuel)
01-2025 - Pemberton Street - Phase 2
Different Types Of Gases.
2025 Coal-To-Gas Company Zhundong 2 Billion Cubic Meters
04-Env-2025 - Biosolids Waste Disposal
Gas Pipe Installation Work
Acquisition Of Laboratory And Mechanical Equipment - A-Mover Project
Calibration And Servicing Of Meters Energy Centre
Various Models Of Gas Meters
Public Bidding Announcement For The Arsenic Bag Filter Modification Project Of Guotou Jincheng Metallurgical Co., Ltd.
Tender Announcement For The Overall Design And Basic Engineering Design Service Of The Coal Gasification Unit Of The Zhundong 2 Billion Cubic Meters Per Year Coal-To-Gas Project Of The Coal-To-Gas Company
Construction Of Underground Drainage Pipelines With Infrastructure Using 500Mm Dia Upvc Pipes To Remove Waterlogging (1000 Meters)