623 Live Notices for 公路建设招标
Showing 1 to 20
Pavement Maintenance Service Agreement- Group B
Pavement Maintenance Services- Group A
Little Rough Run And Cold Run Culvert Replacement
Highways 5 Regional Directorate İskenderun, Garden, Gaziantep Highway Care And Business Chiefs Of The Responsibility Network Of Highways, Connection Roads And Various Segments Of Autocorking Construction, Maintenance And Repair Construction Work Construction Work
Highways 5 Regional Directorate Mersin, Adana Highway Maintenance And Business Chiefs Responsibility Network Motorways, Connection Roads And Various Segments Of Autocorkisms Construction, Maintenance And Repair Construction Work
Navarra A-15 Highway Construction Project. Navarro Section, Of P.K. 21+000 To P.K. 29+000
Pre-Solicitation Notice: Millwood Bridge Deck Replacement
Fy25 Paint And Rubber Removal
The Realization Of The Routing Service Work Of The Large Stadium Of Benslimane Lot 1: The Realization Of The Decoussment Work Of The Rp3323 At The Level Of The Bouznika Exchange In The Casablanca Highway - Rabat Lot 2: The Realization Of The Layout Work In 2X3 Lanes Of The Rp3308 Between The Mohammedia Exchange Is And The Rn1, Reamenagement Of The North Crossroads Of The Mohammedia East Exchange Is Lot 3: The Realization Of Layout Work In 2X2 Lanes Of The Rp3304 Between The Rr322 And The Rn1, Including The Creation Of A Exchange At The Level Of Mansouria Lot 4: The Realization Of The Construction Work Of The Extension In 2X2 Lanes Of The Rp3304 In Clean Site Between The Rn1 And Rr313, Including The Creation Of A Denivele Crossroads At The Rr313 Level
The Realization Of The Routing Service Work Of The Large Stadium Of Benslimane Lot 1: The Realization Of The Decoussment Work Of The Rp3323 At The Level Of The Bouznika Exchange In The Casablanca Highway - Rabat Lot 2: The Realization Of The Layout Work In 2X3 Lanes Of The Rp3308 Between The Mohammedia Exchange Is And The Rn1, Reamenagement Of The North Crossroads Of The Mohammedia Exchange Is Lot 3: The Realization Of The Layout In 2X2 Lanes Of The Rp3304 Between The Rr322 And The Rn1, Including The Creation Of A Exchange In The Level Of Mansouria Lot 4: The Realization Of The Construction Work Of The Extension In 2X2 Lanes Of The Rp3304 On The Rn1 And Rr313, Including The Creation Of A Denivele Crossroads At The Rr313 Level
Construction Of Traffic Safety Facilities In The Area Of R7 Sobu National Highway Office
D1 0136 Říkovice-Přerov
"Determination Of A Design Contractor (Preparation Of A Technical Project And Pup -Pp) And Construction Of A Site:" Ruse - Veliko Turnovo Highway "Byala - Veliko Turnovo - Three Separate Positions: Lot # 1: Deposit № 1: From Km 76+040 To The Intersection With" Hemus ". In A Description Field (Bt-24-Procedure)
Current Maintenance Works - Maintenance Of The Carriageway, Belors, Emergency Bands And Framing Bands - Drdp -Constanta - A2+A4 - Framework Agreement 4 Years
Current Maintenance Works - Aesthetics And Water Drainage - Drdp -Constanta - A2 +A4 Highway - 4 -Year Frame Agreement
Package 04: Construction
New Turin Lyon Railway Connection Common Part Italo -Frrancese Operating Shipyard 02 Autostrada A32 Highway And New Susa Est Junction - Verification Service Art. 42 Of Legislative Decree 36/23 Executive Design Opera "New Torino Railway Connection - Lyon Part Italo -Francese Site Operating Site 02 Raise A32 Highway And New Susa Est Junction
Current Maintenance Works - Aesthetics And Water Drainage - Drdp -Constanta - A2 +A4 Highway - 4 -Year Frame Agreement
Navarra A-15 Highway Construction Project. Navarro Section, Of P.K. 21+000 To P.K. 29+000
Navarra A-15 Highway Construction Project. Navarro Section, Of P.K. 21+000 To P.K. 29+000