2269 Live Notices for 细木工工作招标
Showing 1 to 20
Fpv Ucm Špačince'S Extension
Reduction Of The Energy Intensity Of The Building, Kindergarten, Kalinovská 9, Košice.
Reducing The Energy Intensity Of The Gymnasium Of The Elementary School In Bobrovec.
Reconstruction And Extension Of The Gym
Lycée Des Métiers Du Building In Felletin (23) - Restructuring Of Workshops - Work Market In 22 Lots
25S0063-Construction Of 53 Collective Dwellings In 2 Buildings "L’Entre-Deux" 13, Rue De Melun In Lorient
Sheet Steel Doors
Porton Maintenance And Repair
Interior Joinery Work - Fixed Furniture The Following Deadlines Must Be Met Carefully: - Discount Technical Sheets And Mounting Plans No Later Than 3 Weeks After The Order; - Start Mounting On Site No Later Than 3 Weeks After Validation Of Technical Sheets And Mounting Plans; - Duration Of The Work Is 40 Days. In The Case Of Non-Compliance With The Deadlines Listed Above, Late Penalties Will Be Applied.
PROVIDER TO BUILD AND INSTALL FURNISHED PICNIC HUTS AND PICNIC AREA
PROVISION TO BUILD AND INSTALL TWO WOODEN VIEWING POINTS / LOOK-OUT DECKS FURNISHED WITH STATIONARY BINOCULARS AS PART OF TOURISM DEVELOPMENT IN WITSAND AND STILBAAI
PROVIDER TO BUILD AND INSTALL FURNISHED PICNIC HUTS AND PICNIC AREA
PROVISION TO BUILD AND INSTALL TWO WOODEN VIEWING POINTS / LOOK-OUT DECKS FURNISHED WITH STATIONARY BINOCULARS AS PART OF TOURISM DEVELOPMENT IN WITSAND AND STILBAAI
Fontenay_Xylo_Amenagement
Tf057303 Works Renovation Of The Kitchen Of The Moulins_Lot Penitentiary Center 04 Agri -Food Panels
Works Markets Relating To The Restructuring Of The Hospital Distribution Platform (Pdh) And The Haut-Levêque Hospital Pharmacy
Works On The Bati Heritage Of Riom Limagne And Volcanoes
Interior Joinery And Plastering Work On Built Heritage
Energy Rehabilitation Of A Collective Building Of 98 Dwellings And Its Surroundings
Building Modifications Of The Faculty Of Arts Ou (Part "D" And "Dm", No. 1476, Real 5)