45 Live Notices for 码头建筑招标
Showing 1 to 20
Austertana Marina - Dredging, Construction Of Breakwater, Road And Infrastructure
Floating Swimming Pool For Inner Vågen In Sandnes
Contract For A Principal Contractor For Scarborough Harbour West Pier Regeneration Works
construction of a destination playground to be located at the new Spoilbank Marina.
Water Supply System Of The Zagor Part Of The Marina Mitlo Municipality - Near Upper - Nearly Lower; Phase Iv
Scheduled Repairs (Self-Repairs) Freg. Kl. 124 Hessen 2025 - Work Package 04 Ship Operating Technology
Scheduled Repair (Self-Repair) Freg. Kl. 124 Hessen 2025 - Work Package 02 Propulsion
Scheduled Repairs (Self-Repair) Freg. Kl. 124 Hessen 2025 - Work Package 01 Shipbuilding
Scheduled Repairs (Self-Repairs) Freg. Kl. 124 Hessen 2025 - Work Package 06 Interior
Infrastructure Works For Disaster Risk Reduction Through The Construction Of A Channel Parallel To The Vallarta Urbanization Located In The Municipality Of Villa Del Rosario, North Of Sanyande
Redevelopment Of The Building And The Surrounding Area Of The Building On Via Toscana In Marina Di Cecina And Construction Of A Photovoltaic Electrical System
Redevelopment Of The Building And The Surrounding Area Of The Building On Via Toscana In Marina Di Cecina And Construction Of A Photovoltaic Electrical System
Son Municipal Marina - Dredging Contaminated Sediments - Three Options
Son Municipal Marina - Dredging Contaminated Sediments - Three Options
Renovation and Alteration of Marina Pontoons at Marina Bandar Al Rowdha
Marina Extension Works Phase 4: Construction Of The North Technical Building.
The purpose of this contract is the construction work on the North technical building planned within Phase 4 of the marina extension: Land development.
The Purpose Of This Contract Is The Construction Work On The North Technical Building Planned Within Phase 4 Of The Marina Extension: Land Development.
The Purpose Of This Contract Is The Construction Work On The North Technical Building Planned Within Phase 4 Of The Marina Extension: Land Development.
Open Procedure With Document Reversal On Behalf Of The Municipality Of Seravezza For The Contracting Of The Works For The Construction Of A Railway Underpass On The S.P. 9 Di Marina Located Near The Railway Station In Querceta