29 Live Notices for 采矿矿产咨询招标
Showing 1 to 20
Supply Of Engineering & Other Equipment For Pt.
Supply Of Engineering & Other Equipment For Ent.
Supply Of Engineering & Other Equipment For Emt.
Supply Of Engineering & Other Equipments For Ct.
Supply Of Engineering & Other'S Equipment For Mt.
Procurement Of Consultancy Services For The Development Of A Livestock Policy
Darwin - Engagement Of A Communications Strategist For A Period Of 36 Months
Construction Of Protective Fence For But Son Explosives Warehouse Area - Ha Nam Branch
Package No. 05: Establishing Detailed Planning Tasks And Preparing Detailed Planning Documents At Scale 1/500 Of The Nam Trang Bach Mine Underground Mining Project
Project Preparation Phase: Investment In Renovation, Repair And Upgrading Of C12 Office Building, University Of Mining And Geology
Package No. 04: Topographic Survey At Scale 1/500 Of Nam Trang Bach Mine Underground Mining Project
Providing Materials, Spare Parts, And Repairing Elevators In Building C12; Led Board On The 1St Floor, Automatic Glass Doors Of The Information Center - Library; Humg Letter Set In Lobby Of Building A; Led Board On The 2Nd Floor Of Building A; Automatic Car Monitoring System
Troubleshooting, Cable End Insulation, Testing Medium Voltage Unit (Rmu) At University Urban Area Transformer Station
Preparation Phase For Adjusting The Project Of Investment In Construction Of Technical Infrastructure System Of University Urban Area In Dong Ngac Commune, Co Nhue Commune, Xuan Dinh Commune, Tu Liem District, Hanoi City (Now Duc Thang Ward, Co Nhue 2 Ward, Xuan Dinh Ward, Bac Tu Liem District, Hanoi City - Area Of University Of Mining And Geology And Shared Dormitory Area
Bidding Packages Under The Project Of Installing Cameras And Building Software To Monitor Sand Mining In Ben Tre Province
Package No. 79: Establishing The Planning Adjustment Task And Preparing The Adjustment Dossier (2Nd Time) Of The Construction Planning At A Scale Of 1/500 For The Open-Pit Mining Project Combined With The Renovation Of Nam Trang Bach Mine Lakes.
Project Contractor Selection Plan: Resettlement Area Serving Site Clearance For Na Rua Iron Mine Open Pit Mining Project, Cao Bang City, Cao Bang Province
Drilling Holes, Loading And Transporting Soil And Rock At Dong Da Mai Mine In 2025
Plan For Selecting A Contractor For The Project: Renovation And Embellishment Of The First Party Cell Establishment Point In The Mining Area In Dan Chu Area, Mao Khe Ward, Dong Trieu City; Items: Upgrading The Asphalt Road, Parking Lot, Renovating The Campus Of The Party Cell Point
Plan For Selecting Contractors For The Preparation Work Of The Dong Vong Mine Underground Mining Project (Supplemental Part)