19 Live Notices for 粒子加速器招标
Showing 1 to 19
Hydroformed Bellows For Super Frs
Slow Halo Collimator Drives For Sis100
Framework Agreement For Manufacturing Of Minerva Electromagnets
Security Of Post -Warranty Service For Linear Electa Versa Hd Accelerators, Monaco Planning Planning System And Mosaiq Information System
Pumping Chambers For Sfrs
High Power Rf Circulators For Myrrha Phase I (Minerva) 100 Mev Proton Linac
Hydroformed Bellows For Super Frs
Delivery Of The Accelerator With Adapting The Rooms To The Needs Of The Teleradiotherapy Studio And The Delivery Of The Medical System
Maintenance Cleaning For Gsi (Clock) - 09/2025 - 09/2029
Announcement - General Guideline, Standard Regulation Open Procedure (Services) Maintenance Cleaning For Gsi (Clock) - 09/2025 - 09/2029 The Gsi Helmholtzzentrum For Heavy Ions Research In Darmstadt Operates One Of The World'S Leading Particle Accelerators For The Research . More
Maintenance Cleaning For Gsi (Clock) - 09/2025 - 09/2029
Preventive And Corrective Maintenance Of Electrical, Electrotechnical And Water Circulation Of The Particle Accelerators And Electric Sanitation Of These Installations
Fair Planning, Specification Development, And Supervision Of Assembly Services In The Sfrs
Manufacture, Installation And Necessary Test Of The Cave Of The Miracles Instrument.
Qualification Phase - Radiation Therapy System For The University Hospital Northern Norway Hf
Manufacture, Installation And Necessary Test Of The Cave Of The Miracles Instrument.
Pumping Chambers For Sfrs
Replacement Purchase Of Linear Accelerator (Truebeam Tandem) Including Construction Work As General Contractor Measure
Ukri-4731 - Cryogenic Methane Moderator Systems