4484 Live Notices for 管道招标
Showing 1 to 20
Replacement Of The Drinking Water Pipeline, Cannes Road To Varennes Sur Seine.
Ld-4330-24-Oe-De Maintenance Work On The Flushing Pipes
Ve01 Track, Pipeline And Road Construction
Sewer, Road And Pipeline Construction Work At Piepersloh In Lüdenscheid Here: Dulmecker Weg, Piepersloher Platz, Westerfelder Weg And Bremecker Weg
Procurement Of Current Repair Works To Be Carried Out At "Dormition-Student House" No. 1 Of Baku State University
Works Related To Emergency Removal Of Leaks In The Central Heating, Compressed Air And Sewage Pipelines On The Premises Of Pgnig Termika Energetyka Przemysłowa S.A. In 2025 - 2027
Strengthening The Aep Of The Missour, Outat El Haj And Neighboring Centers From The Hassan Ii Dam - Lot 2: Pipeline 2.
Improvement Of The Ghafsai Treated Water Supply System From The Treatment Plant - Lot 1: Pipeline
The Proposal Of D.E.Y.A. Selinou Is Going To Replace Parts Of The Water Supply Network In The Five (5) Local Communities Of The Municipal Unit Of Pelekanos In Order To Upgrade The Network Of The Areas, To Improve The Quality Of The Services Of D.E.Y.A. And Reduce Wastage Of Lost Water. In More Detail, These Are Networks Built From The 70S And 80S, Without Hydraulic Studies, With Occasional Extensions, Without Having Followed The Layout Plans As Well As Without Provisions For Taps And Other Modern Devices. More Specifically, These Communities Are: 1. Taliana Settlement (Holy Triada) 2. Moustakos Settlement 3. Livadi Settlement 4. Tsistrida Area 5. Lagadas Settlement The Implementation Of The Works For The Installation Of The Pipelines Will Be Carried Out By The Staff Of D.Ey.A. Selinou (Plumbing Craftsmen, Workers And Machinery).
Implementation Of Thermal Insulation Works And Preparation Of Metal Surfaces For Metal Inspection On Vessels And Pipelines Of Main And Auxiliary Equipment Of The 1St Circuit And Pipelines Of The Heating Medium Of Units 5.6, Dgs And Special Building-3 In 2025.
H387 - Increase The Durability Of The Tx10,20,30 System By Innovating The Cooling Of The Pump And Motor
Polyethylene Pipe Pe 100 Sdr 11
Water Supply Bad Salzungen, Reconstruction Of Long-Distance Pipeline Shaft Bw30
Hufelandstraße 5-8, 99734 Nordhausen - Lot 402 Electrical Installation General
Mature Gas
Gaz
Natural Gas Pipeline Transportation Service
Natural Gas, December 2024, 6000
The Geothermal Well Building, Re-Injection Line And Automation System Installation Works Will Be Carried Out.
Pipeline Improvement Work Within The Area Of Mm-06-Trang-Palian, Thap Thiang Subdistrict, Mueang District, Trang Province