12 Live Notices for 铁路货车招标
Showing 1 to 12
Supply of Motor Vehicles Lot 1- Two (02) Station Wagon Vehicles Lot 2 - One (01) Double Cabin Pickup
Rotating Car Assembly Spare Parts For All Freight Wagon Assembly
Purchase Of Paint To Be Used In Freight Wagon Manufacturing
Nostava-Tikkakallio Partial Master Plan, Rail Traffic Report
Bim – General Planning Services, Klv Munich Riem, New Location
Vtpt'S Sudden Purchase In 2024 Of The Freight Wagon Branch
Project: Installing Iron Frame And Corrugated Iron Roof To Extend The Workshop For Repairing Carriages On Route 15-16, Giap Bat Carriage Repair Station, Belonging To The Freight Wagon Branch
Contractor Selection Plan Project: New Installation Of 3-Phase Production Power Line On Line 16 - Yen Vien Wagon Examination And Repair Station (Yen Vien Station) Of The Freight Train Branch.
Leasing Of Rail Wagons
Leasing Of Rail Wagons
Transition Screw Coupling (Complete) For Freight Stock For Bobyn Wagon As Per Drg.No. Sk-69503, Alt-11. Spec. No. R-9-6.
Transition Screw Coupling (Complete) For Freight Stock For Bobyn Wagon As Per Drg.No. Sk-69503, Alt-11. Spec. No. R-9-66 With Corrigendum No.3