37 Live Notices for 铁路信号工作招标
Showing 1 to 20
Féderation Maneuver Area - Rail Signaling
Estw Niebüll Ibn 3: Lot 1 Cable Deep Construction, Top Construction, Track Field Lighting, Lot 2 Signal Booms
Package No. 13: Moving railway signal information system
Installation And Harmonization Of The Pu And Ss Infrastructure Sub-Substitution On Sisak Caprag (Isklj)-Novska (Isklj) Railway M502 And Sunja-Volinja (Uklj)-State Border Of The R102 Railway Line
Optimization Of The Karlštejn Track (Out) - Beroun (Out)
Construction And Modernization Of Railway Infrastructure In Connection With The Planned Construction Of An Integrated Interchange In Bielsko-Biała.
Current Repairs At The Ifte Installations On The Radius Of The Ifte Bucharest Section-Remote Control Of The Macazuri Heaters In The Cf Cap X And Y Station
Current Repairs At The Ccs-T Installations Within The Ct4 Section Of Ploiesti-Ced Installations In The Cioran And Ialomita Stations And The Bla Installations On The Distance Ialomita-Cioran
Refurbishment Bauhof Victorstr. 134 Castrop-Rauxel
Installation And Harmonization Of The Pu And Ss Infrastructure Sub-Substitution On Sisak Caprag (Isklj)-Novska (Isklj) Railway M502 And Sunja-Volinja (Incl.)-State Border Of The R102 Railway Line
Abs Hanaugelnhausen Cable Deep Construction
Design And Execution Of Works As Part Of The Project Entitled: "Works On The C -E 20 Railway Line On The Section Skierniewice - Czachówek Wschodni"
Design And Execution Of Construction Works As Part Of The Investment Task Entitled: "Works Necessary To Control Railway Infrastructure Within The Sokółka Station"
5010040286 - Electronic Signaling Contract At Entroncamento Station And Mato Miranda Technical Station "
5010039294 - Expection Called «Signaling & Etbs - Conception, Supply, Assembly And Maintenance (Various Rfn Sumens)»
On Tk On The 4000 Route, Electrification And Expansion Hochrheinbahn
Increasing The Economic Efficiency And Railway Safety By Increasing The Level Of Centralization Of The Railway Signaling Installations - 8 Lots: Lot 6 - Cf Stations: Lot 1 - Srcf Bucharest - Târgoviște And Nucet Stations, (Design And Execution)
Ubf Augsburg - Gersthofen, New Construction Of An Eow System
Etcs Fitment For Vr-Group Plc'S Rolling Stock / Invitation To Participate
Construction Of The Biała Rawska Station On The Railway Line No. 4 As Part Of The Project "Modernization Of Railway Line No. 4 - Central Magistrala Stage Ii"