155 Live Notices for 安全咨询招标
Showing 1 to 20
Mun-Cms-32-2024-M1Supervision And Consultancy Services For Soft Landscaping Works
Supervision And Consultancy Services For Soft Landscaping Works
Local Behavioral Measures For Road Safety
Prevention And Protection Service (Rspp) Aimed At Coordinating Activities Related To The Protection Of Health And Safety In The Workplace And The Role Of Competent Doctor For Health Surveillance And Related Activities.
Call For Proposals For The Individual Consultant To Compile The Gap Analysis On Seychelles Occupational Safety And Health (Osh) Legislation In Relation To The Ilo’S Protocol Of 2002 To The Occupationa Open New Window
Procurement Of Consultancy Services For Conducting A Nationwide Public Awareness Survey
Safety Advice And Assessment By An Accredited Qualified Organization (Qao) As Part Of The Port-La Nouvelle Rail Freight Development Operation.
Contractor Selection Plan, Bidding Package: Consulting On Survey, Preparing Technical Research Report For The Project: Repairing And Supplementing The Traffic Safety System On Section Km0-Km90 Of National Highway 4G, On Section Km27-Km80+715 Of National Highway 43, On Section Km217-Km272+200 Of National Highway 279, On Section Km281-Km331+300 Of National Highway 12, On Section Km28+300-Km105+750 Of National Highway 279D, On National Highway 37 And National Highway 32B, Son La Province (Not Overlapping The Scope Of Projects To Repair The Roadbed, Road Surface And Works On The Route In 2025)
Contractor Selection Plan For The Package: Survey Consulting, Preparation Of Feasibility Study Report, Project: Repairing Damage To The Foundation, Road Surface, And Works On Section Km105+973 -Km110+978; Handling Small Radius Curves To Ensure Traffic Safety On The Km22+200- Km22+500 Section; Repairing And Enhancing Traffic Safety At Some School Locations (Km6+740; Km11+890; Km12+592; Km46+551; Km46+598) On National Highway 4G, Son La Province
Khlcnt Cbđt Maintenance, Repair, Installation Of Traffic Light Systems And Traffic Safety Systems For Traffic Works In Phuc Yen City
Contractor Selection Plan For The Package: Consulting, Surveying, Preparing The Economic - Technical Report Of The Project: Repairing And Completing The Traffic Safety System On National Highway 37, Bac Giang Province
Contractor Selection Plan For The Package: Consulting On Survey And Preparation Of Feasibility Study Report For Construction Investment: Repairing Damaged Foundation, Road Surface And Works On Section Km75+200 - Km76+00 And Repairing, Supplementing And Strengthening The Traffic Safety System At The School Location On National Highway 32C, Phu Tho Province
Contractor Selection Plan For The Package: Consulting, Surveying, Preparing The Economic - Technical Report Of The Project: Repairing And Completing The Traffic Safety System On National Highway 17, Bac Giang Province
Plan To Select A Contractor For Consulting On Survey And Preparation Of Economic And Technical Report On Construction Investment: Repairing And Supplementing The Traffic Safety System On The Route And Strengthening The Traffic Safety System At The School Location On National Highway 32B, Phu Tho Province
Plan To Select A Contractor To Implement The Consulting Package For Surveying And Preparing The Technical Economic Report For The Project Of Construction And Upgrading The Route To Create Landscape And Ensure Traffic Safety From Petrolimex Gas Station No. 223 To The Foot Of Yen Tho Bridge
Contractor Selection Plan, Bidding Package: Consulting Survey, Preparing Feasibility Study Report, Project: Repairing Damaged Roadbed, Road Surface And Constructions On Section Km0-Km5; Repairing And Supplementing The Traffic Safety System On The Main Route Ta Lang - Co Noi: Km0-Km56; Branch Route Kim Chung - Lao Kho: Km0-Km13+200, National Highway 6C, Son La Province
Repair And Strengthen The Traffic Safety System On Truong Son Dong Road, Local Sections Km0+00 - Km142, Quang Nam Province, Section Km142+00 - Km175I+00, Quang Ngai Province.
Contractor Selection Plan For The Package: Consulting On Surveys, Preparing A Feasibility Study Report For The Project: Repairing Foundations, Pavements And Works On The Section Km82+250 - Km85, National Highway 31 And Repairing And Completing Improve The Traffic Safety System On The Route From Km46 - Km99, Bac Giang Province
Contractor Selection Plan Implementation Preparation Phase Information Technology Service Rental Plan Social Order And Safety Surveillance Camera System (Continuing Phase 1 From 2024-2029)
Repair And Strengthen The Traffic Safety System Of Local Sections Km412+532 - Km497+535 (West Branch), Km1320+365 - Km1407+495, Km1407+495 - Km1564+327, 1585+710 - Km1609+00, Km1793 - Km1946 Of Ho Chi Minh Road; Section Km0 - Km66+00, National Highway 14G; Section Km70+740 - Km83+600, Km90 - Km108, Km155 - Km168, Km241 - Km243, National Highway 19; Section Km230 - Km247, Truong Son Dong Road; Section Km00 - Km30 Of Pleiku Bypass; Repair And Enhance Traffic Safety On The Section Passing Through School Locations Km1407+495 - Km1564+327, Km1564+327 - Km1667+570, Km1667+570 - Km1793+00 Ho Chi Minh Road; Km175I+00 - Km230+00, Km230 - Km317, Km495+200 - Km626 Truong Son Dong Road; Km67 - Km241, Ql19; Km151+050 - Km177+950, Ql.19C Km32 - Km151, Ql26.