21 Live Notices for 蒸汽和水管招标
Showing 1 to 21
China Petrochemical Materials And Equipment Department (International Company) Shanghai Petrochemical Thermal Power Project And Shanghai Ethylene Project High Pressure Steam Pipes High Pressure Steam Valve Forgings (Free Forging) Qualified Suppliers Concentrated Qualification Pre-Examination Pressure-Bearing Forgings (Free Forging) For High Pressure Steam Valves (Free Forging) (Material Is F91) Pre-Examination Announcement
Procurement And Installation Of Water And Heating Pipelines At The Location Of The Desulphurization Plant For The Needs Of The Branch Of The Thermal Power Plant "Kakanj" Kakanj
Pu 320 Roofing, Plumbering, Sealing And Carpentry After Din 18338, 18334, 18336, 18339- 1631/2025
Public Tender Announcement Of The Supplementary Testing Technical Service Project Of Equipment Manufacturing And Installation Quality And Safety Performance Of Guotou Jineng (Zhoushan) Gas Power Generation Co., Ltd.
Thermal Insulation Provision Of The Thermal Skid Loop - Formulations 1 - Building 11 Of The Unc Hemodevados Laboratory.
Repair Arctic Utilidor D (Ftqw 20-0502) & Utilidor H (Ftqw 23-1001)
Works Markets Relating To Design, Detailed Engineering, Manufacturing, Delivery, Implementation And Commissioning Of Fluid And Utility -Type Structures
2025/54 Renewal Works Of Fire Protection Facilities-Fire Mouths. Faculties Of Physics And Chemistry (Old Part)
The Intervention Will Be To Withdraw The Current Network Of Pipes That Serves The Existing Fire Mouth Equipment, Maintaining Their Position And Replacing Them With New Teams. Also, Disused Pipes Corresponding To Old Gas, Cold Water And Steam Pipes Will Be Removed Currently Out Of Service, In Accordance With What Is Described In The Executive Project.
Works Markets Relating To Design, Detailed Engineering, Manufacturing, Delivery, Implementation And Commissioning Of Fluid And Utility -Type Structures.
Purchase Of Water Pipe And Re And Rp Connection Material For Pipe
Works Markets Relating To Design, Detailed Engineering, Manufacturing, Delivery, Implementation And Commissioning Of Fluid And Utility -Type Structures.
Plan And Design Services For The Construction Of Steam-Heating Pipes In Additional Rooms
Repair Arctic Utilidor D (Ftqw 20-0502) & Utilidor H (Ftqw 23-1001)
Replacing The Water System Electropumps For Capacitors Cooling (Bsi 71210), Including Redesign/Replacement/Updating All Auxiliary Systems. The Replacement Will Also Include The Compensatory 7121-Ej-01 . 04 And The Valves With Flap 7121-V01 . V04
Medicines With The Active Ingredient Octreotide (Atc: H01Cb02 - Retarded Dosage Forms)
Medicines With The Active Ingredient Octreotide (Atc: H01Cb02 - No Retarded Dosage Forms)
Medicines With The Active Ingredient Combination Formoterol And Aclidinium Bromide (Atc: R03Al05)
Water - Steam Pipes
Water - Steam Pipes