3 Live Notices for 海底管道招标
Showing 1 to 3
The Wwtp'S Outfall Has Several Broken Flanges (16 Units), So Part Of The Effluent Escapes Through The Various Breaks And Much Closer To The Coast Than It Should. Its Repair Is Necessary To Avoid A Possible Impact On The Quality Of Bathing Water, And To Avoid Major Structural Damage. The Leaks Detected Must Be Repaired With New Flanges.
Petrojam Subsea Pipeline Survey
24/025 Greater Dublin Drainage (Gdd) Project (Market Engagement)