958 Live Notices for 远程信息处理系统招标
Showing 1 to 20
7G--Network Switches
Davis-Monthan Afb - Base Telecommunications Service (Bts) - Combo/Solicitation
Local Telecommunication Services/Bvoip
Local Telecommunication Services (Lts)
Total Fleet Solution Framework
Koskenmäki Library/Youth Center, Complete Demolition Contract
Digital Rail Germany (Dsd) Starter Package Scan-Med Bim Planning Services Lph 1-3 - Option Lph 4; Lph 6 & 7 | Etcs Equipment For The Salzwedel Network District Lot 1 - Control And Safety Technology (Lst) Lot 2 - Telecommunications (Tk) Lot 3 - Overhead Line (Ola)/ 50 Hz Lot 4 - Level Crossings Lot 5 - Cable Underground Construction (Ktb) Lot 6 - Building Construction Track Field Concentrator (Gfk) Including Technical Building Equipment (Tga)
Announcement Of Consultation No. 01/2025
Construction Of The Jurassic Nature Education Centre Ekomałopolska And The Headquarters Of The Zpkwm Branch In Kraków.
2025-T-15 - Backup Storage Repository Expansion
2025-T-16 - Supply And Delivery Of Hewlett Packard Storage Area Network
Pavement Repairing By Carpeting And Single Bituminous Surface Treatment (Sbst) Works At Ch.01+800 Km To Ch. 03+700 Km And Ch.08+270 Km To Ch. 08+400 Km Of Tarash-Hamkuria (Z-6032) Road Under Road Division,Sirajganj During The Year 2024-2025
Road Marking Paint Works At Ch. 0+000 To Ch. 20+000 Of Saidabad-Enayetpur (Khaja Yunus Ali Medical College Hospital) Road (Z 5409) And Ch. 0+000 To.C H. 17+000 Of Tarash-Ranirhat-Sherpur Road (Z 5049) Under Sirajganj Road Division During The Year 2024-2025.
Supplying Of 228 Nos Skilled Labour & 566 Nos Unskilled Labour For Departmental Maintenance Work At Different Roads Of Road Sub-Division-1, Sirajganj Under Sirajganj Road Division During The Year 2024-2025.
Pavement Repairing And Single Bituminous Surface Treatment (Sbst) Work At Ch. 4+000 To 6+000 Of Saydabad-Enayetpur (Khaja Yunus Ali Medical College Hospital) (Z-5409) Road Under Sirajganj Road Division During The Year 2024-2025
Pavement Repairing With Carpeting And Single Bituminous Surface Treatment (Sbst) Work At Ch. 0+000 To Ch. 2+000 Of Jamuna Bridge (Soydabad)-Sirajganj Road (R-451) Under Sirajganj Road Division During The Year 2024-2025.
Pavement Repairing By Potholes And Single Bituminous Surface Treatment (Sbst) Works At Ch. 18+494 Km To 19+900 Km & Ch.21+000 Km To 22+370 Km Of Ullapara-Purnimagati-Tarash (Z-5046)Road Under Road Division,Sirajganj During The Year 2024-2025
Pavement Repairing By Premix Bituminous Carpeting And Single Bituminous Surface Treatment (Sbst) Work At, Ch. 3+000 To 5+750 & Ch. 9+150 To 9+900 Of Bhangura Upazilla Connecting Road (Z-6033) Under Pabna Road Division During The Year 2024-2025.
Supply, Installation, Testing & Commissioning Of A Motor Control Centre (Mcc) And Pfi Panel At Erl Rm -7 Jetty
Premix Bituminous Carpating And Seal Coat Works At Ch.35+100 To 35+600 Km(P) Of Tebunia-Chatmohor-Handial-Hamkuria Road (R-604) Under Pabna Road Division During The Year 2024-2025.