729 Live Notices for 热绝缘招标
Showing 1 to 20
53--Insulation,Thermal,
Reconstruction Of The Building Of The Municipal Office And Reducing Energy Intensity - Hrabovčík
Gypsy Gymonia - Spaces For Pupils' Interest
Bratislava - Reconstruction Of The Building On Dulovo Square - R
Thermal Insulation Of The Bed And Therapeutic Pavilion "B" In The Specialized Hospital Of St. Svorada Zobor, N. O.
Improving The Quality Of Education In The Primary Art School Myjava
Increase The Energy Efficiency Of The Elementary School Building In Bernolákovo
Increase The Energy Efficiency Of The Elementary School Building In Bernolákovo_ Repeatance
Installation Of A New Daper, Heater And Oil Dehumidifier In Accordance With The Executive Design
Installation Of A New Daper, Heater And Oil Dehumidifier
Installation Of A New Daper, Heater And Oil Dehumidifier
Project Management Mission Relating To Thermal Insulation Work From Outside - Renoir Residence
Works Reh.Nerg.Integral 64 Vpp Pza Windmills 1.2 And 3 Huelva
Contract Works Abit 1 Valencia Street Nº 40 And Nº 42 De Picanya. Neighborhoods
Contract Of Execution Works Of The Singular Project Of Clean Energy Of Játar. Lot 1: Measure 01: Reduction Of Demand And Energy Consumption In Buildings And Public Infrastructure. Lot 2: Measure 03: Renewable Thermal Generation Facilities And Heat And/Or Cold Networks.
- Earthmoving Work: 500 M3 - Stackage Work: 200 M3 - Murdling Demolition Work: 160 M3 - Wooden Floor Removal Work: 300 M2 - Waterproofing Work: 30 M2 - Thermal Insulation Work: 230 M2 - Reinforced Concrete Work: 130 M3 - Formwork Work: 400 M2 - Ferraillage Work: 21,000 Kg - Starting Work: 200 M2 Work: 08.09.2025 Duration Of The Work: 175 J.O.
Thermal Insulation And Refection Work Of Exterior Joinery Of Municipal Accommodation
Thermal Insulation And Refection Of Exterior Joinery
Accessibility Of The Hôtel Du Department Site
Construction Of A Photovoltaic Courtyard And Works Improving The Energy Performance Of The Lepeltier School Group