186 Live Notices for 废物处理厂的建筑招标
Showing 1 to 20
Design and construction of Wastewater Treatment Plant
Rfq# 25-086-T Water, Stormwater, And Stormwater Lining Pre-Qualified Contractors
Extension Of Water And Sewerage Networks In The City Of Ineu
Construction Of Internal And External Network Sevening Improvers And Pc Watter Treatment Installation. Petaldiou Of Municipality Municipality 2: Construction Of Waste Training Installation (Eel)
<< “Establishment And Extension Of The Waste Water Network In Selaru Commune, Dambovita County” - Works Execution Phase >>
Collection Yard For The Project "Increase The Capacity Of Separate Collection Of Municipal Waste In The Village Veličná"
WORKS OF SUPPLY, MANUFACTURE, DELIVERY TO SITE, INSTALLATION, TESTING AND GUARANTEEING THE PERFORMANCE OF BODY TRUNKING WET SCRUBBER CONVERSION AND RELATED WORKS AT FELCRA BERHAD PALM OIL MILL BUKIT KEPONG, LABIS, JOHOR
Separate Procurement For Group 2 - Construction Of The Solar Solar Drying Plant Of The Rovinj Agglomeration Agglomeration
Expansion Of The Biological Cleaning Level In The Main Sewage Treatment Plant Trier
Construction No. 8548 Sewer Collector H Extension To Běchovice, Stage 0002 Sewer H2 Běchovická; Construction Work
Execution Of Clean Points Works In Atarfe (Gr), Jódar (Ja) And Casares (Ma)
Execution Of Clean Points Works In Atarfe (Gr), Jódar (Ja) And Casares (Ma)
The Actions Are Described In The Construction Project Of This Contract, Which Is Included In The Documentation Provided In This Tender, And In General They Can Be Divided Into Two Major Sections: Mechanical And Electrical Detail Engineering To Adapt The Equipment Offered By The Successful Bidder To The Spaces Indicated In The Project, The Supply And Installation Of Electromechanical Equipment Or Modification Of The Existing Ones, And The Installation Of New Electrical And Control Panels With Interface Scada Or Modification Of The Existing. Important Note: The Construction Project Of This Tender Also Includes The Ribbon To Transport The Bioassecada Died After The Primary Garbage To The Silos Of Aerated Bioestabilization-1 (Tb-Bc) Transporter
1 Month 18 Day (S) 12 Hours (S) 27 Minute (S) 51 Second (S)
25-005 Tidewater & Portsmouth Lift Stations Rehabilitation
Ve15 Construction Work (Upgrading The Warendorf Central Sewage Treatment Plant)
Execution Works Sevails Inertes T.M. Líjar (Al)
Call Off Contract 2025 - 2027 For The Removal And Disposal Of Material Off Site To Tip Or Recycling
New Building Kva Buchenhofen - Lool 1: (Special) Civil Engineering / Transport Facilities / Earth -Laying Pipes
Reconstruction And Extension Of The Urban Mechanical And Biological Sewage Treatment Plant In Sztum