628 Live Notices for 防水工作招标
Showing 1 to 20
Gypsy Gymonia - Spaces For Pupils' Interest
Punctual Repair And Resumption Of Waterproofing On Terraces Roofs
Reform Work Of The Roofs Of Modules 23 To 26 Of The Valencia Penitentiary Center
- Earthmoving Work: 500 M3 - Stackage Work: 200 M3 - Murdling Demolition Work: 160 M3 - Wooden Floor Removal Work: 300 M2 - Waterproofing Work: 30 M2 - Thermal Insulation Work: 230 M2 - Reinforced Concrete Work: 130 M3 - Formwork Work: 400 M2 - Ferraillage Work: 21,000 Kg - Starting Work: 200 M2 Work: 08.09.2025 Duration Of The Work: 175 J.O.
Frame Work, Coverage, Tinkering, Scaffolding, Exterior Wooden Carpentry And Waterproofing: - Exchange: 950 M2 - Demolition Of A Zinc Cover: 416 M2 - Roof Insulation, New Zinc Cover, Tinkering: 416 M2 - Wooden Structure Extension: Lower Wood Floor, Wood/Roof Floor: 24 M2, Vertical Walls: 40 M2 Horizontal Waterproofing: 24 M2, Exterior Joinery + Blinds: 7 M2, Openwork Wood Cladding: 50 M2 Foreseeable Start Of Work: Phase 1 (Main Roof) - Early September 2025 / Phase 2 (Extension) - February 2026 Predictable Duration Of Work: Phase 1 - 30 Working Days, Phase 2 - 45 Working Days.
Repair Of The Tightness Of The Roof Terrace Of A Residence
Rehabilitation Work For The Repair Of Terraces Roofs Of The Hainaut Cpam Site Located At 24 Rue De La Croix
Refurbishment Work Of The Warmness Of The Terrace Roof Of The "Les Jardins De La Doutre" Building By The Ehpad Saint Nicolas - Chu D'Agers.
Waterproofing Repair Work On The Heritage Of Morbihan Habitat'S Heritage.
Repairing Work Of The Tightness Of The Bel Air School Group, The Châter School Group And The Iris Room
Works For Buildings In The Tarn Department.
Construction Of An Ime, Sessad And Two Boarding Schools
Construction Of An Inter-Municipal Technical Pole For The Community Of Commune Of The Grand Pic Saint-Loup.
Creation Of A Local Business "Bistrot De Pays"
Upgrading The Accessibility Of Municipal Erps.
Sante House Extension
Renovation And Layout Of The Poitiers Ofb Site.
Return To Safety And Thermal Improvement Of The Cdg 80.
Construction Of The Headquarters Of The Community Of Communes Of Ribeauvillé.
Installation Of The Museum Of Fine Arts On The Site Of The Château De L'Hermine