9 Live Notices for Romania Railway Rolling Stock Tenders
Showing 1 to 9
Imperio Tram Parts - Stainless Steel Hose Collar Package 12-20Mm, Stainless Steel Hose Collar 16-27Mm, 2-40Mm
Renault Master Side Door Interior Handle Mechanism
Renault Master Side Door Interior Handle
Parts For Desiro Sr 20 D Cars - Divided Into 7 Lots
Parts For Desiro Sr 20 D Cars - Divided Into 7 Lots
"Electric Railway Signaling Equipment - 4 Lots" - Srcf Brațov
Spare Parts For The Maintenance Of The Electronic Centralization Installation For Metro Lines 1, 2 And 3
Annual Sectoral Procurement Program For The Year 2023 (Version 25.04.2023) / Annual Rolling Stock Modernization Procurement Program, Funded Through The National Recovery And Resilience Plan, Component 4 Sustainable Transport I2 – Rail Rolling Stock For The Year 2023 - Centralization On Codes Cpv
Project Annual Sectoral Procurement Program For The Year 2024 Version 15.12.2023/Procurement Program For The Project "Modernisation Of 55 Electric Locomotives Intended To Tow Passenger Trains, Conversion Of 20 Hydraulic Diesel Manufacturing Locomotives Into Electric Locomotives With Battery And Modernization Of 139 Wagons Of Travelers" Financed Through Pnrr, Component 4 Sustainable Transport, I2-Rail Rolling Stock, For The Period 2023-2026-Centralization On Cpv Codes