Similar tenders from other countries.
Showing 1 to 20
Usda Seeking 18,000 - 18,700 Aboa Sf Of Office, Warehouse, Classification Laboratory, Plus 12,000 Sf Of Ware Yard In Rayville, La.
Scotland Energy Efficiency Framework
Solar Panel Fhg24293Jc
Wp4090 - Net Zero Programme - Energy Efficiency Assessments
Increasing The Energy Efficiency Of The Municipal Office Building In The Municipality Of Štefanov Nad Oravou
Energy Efficiency Works At Coslada Hospital And Maintenance Of Air Conditioning Equipment
Execution Of Works Corresponding To The Project “Optimization In The Use Of Water Resources From Desalinated Water And Improvement Of Energy Efficiency Through Photovoltaic Solar Pumping And Energy Storage System For Aguas Del Almanzora, S.A. (Almería)”
Improvement Of The Energy Efficiency Of The Town Hall. Multi-Annual Subsidy And Close To Competitive Bidding For The Execution Of Energy Efficiency Works In Buildings And Infrastructures Linked To The Provision Of Municipal Services, Likely To Be Co-Financed By The European Union Within The Framework Of The Galicia Feder 2021-2027 Programme (Pr486D).
Service Contract For Technical Assistance For The Management Of The Execution Of The Rehabilitation And Energy Efficiency Improvement Works Of The Cap Amadeu Torner Building In L'Hospitalet De Llobregat. Code: Cap-22238, Included In The Public Building Rehabilitation Promotion Program (Pirep), Within The Framework Of The Recovery, Transformation And Resilience Plan – Funded By The Eu. Next Generation Eu
Design And Execution Of Works For “Rehabilitation Of The Biertan Grades I-Iv School”
Energy Efficiency, Rehabilitation, Modernization And Equipment Of The “Sfantul Nicolae” Technological High School, Mihai Viteazul Street, No. 12, Deta City, Timis County
Energy Efficiency And Air Conditioning Measures - Joane School Center
Improve Energy Efficiency, The Building Envelope And The Incorporation Of Insulation. In The Vertical Elements Of The Envelope, The Construction Solution Adopted Is Always The Same, To Create An External Thermal Insulation System (Sate) In The Opaque Enclosures Of The Main Building. Its Thickness Is 8, 10 Or 12 Cm Depending On The Case. In The Gaps Of The Openings, The Thickness Of The Insulation Is Reduced In Order To Be Able To Stay Within The Thickness Of The Frames Of The Carpentry And Thus Eliminate The Thermal Bridge In Jambs, Lintel And Sill. Regarding The Finish Of These Walls, In Most Facades A Ceramic Baseboard Is Planned To Improve Their Durability, And The Rest Of The Surface Is Solved With A Thin-Layer Organic Finish. Secondly, Regarding The Horizontal Elements, We Find Different Systems To Incorporate Insulation In The Existing Elements. In Summary, We Find Three Types Of Constructive Solution: The First When The Roof Has An Air Chamber, The Second When The Roof Is Inclined And In Direct Contact With The Outside And Finally We Have A Part Where There Is A Registerable False Ceiling But Without Insulation. In The First Case, The Insulation Is Achieved By Blowing The Necessary Thickness Of Insulation From The Upper Part Of The Roof In Order To Avoid Interference With The School. In The Second Case, The Solution Involves Adding A False Ceiling That Incorporates The Required Insulation And, In The Last, Insulation Will Be Added Above The Existing False Ceiling. There Is Also A Series Of Interventions Focused On Reducing Overheating Of The School Classrooms, Which Do Not Have Any Cooling System. In This Way, The Comfort Of Users Will Be Improved, Especially In The Hot Months. It Is Proposed To Reduce Incident Radiation Through Two Different Shading Systems.
Hiring Of A Technical Control Body For The Mission Of Stability Control And External Control Of Energy Efficiency Certifications In Four Lots.
Negotiated Procedure For The Implementation Of Works Related To The S.E.M. Project – Smart Energy Mountain –
Rehabilitation Of The Hauts De Loutraz District, Lot 2
Design Of The Korppoo Sorting Station Building
Construction Of An Energy Recovery Facility For The Energy Fraction Of Waste (Rdf, Pre-Rdf) In Stalowa Wola
Service Contract For Technical Assistance For The Management Of The Execution Of The Rehabilitation And Energy Efficiency Improvement Works Of The Cap Amadeu Torner Building In L'Hospitalet De Llobregat. Code: Cap-22238, Included In The Public Building Rehabilitation Promotion Program (Pirep), Within The Framework Of The Recovery, Transformation And Resilience Plan – Funded By The Eu. Next Generation Eu
Execution Of The Work “Reduction Of Energy Demand And Improvement Of Comfort In The Main Building Of The Escola De Ponts”.